Coil Resistance Inspection
- Remove the battery cover. (See BATTERY REMOVAL/INSTALLATION [MZR 2.5] .)
- Disconnect the negative battery cable.
- Remove the plug hole plate. (See PLUG HOLE PLATE REMOVAL/INSTALLATION .)
- Disconnect the OCV connector.
- Measure the resistance between terminals A and B using an ohmmeter.
OCV coil resistance
- 6.9-7.9 ohms [20°C {68°F}]
- If not as specified, replace the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION .)
- Install in the reverse order of removal.