Installation [10/2022 - ]: Procedure
WARNING: This page is about a different car, the 2025 Lexus RX 450h+, 2025 Lexus RX 350h, 2024 Lexus RX 450h+, 2024 Lexus RX 350h, and 2023 Lexus RX 350h. However, it is still accessible from the selected car via links, so may be relevant.
- INSTALL NO. 3 EXHAUST MANIFOLD HEAT INSULATOR
Torque: 16 N.m (163 kgf/cm, 12 ft.lbf)
- INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
- Apply a light coat of engine oil to a new O-ring.
- Install the O-ring to the engine oil level dipstick guide.
- Using an 8 mm socket wrench, install the engine oil level dipstick guide to the camshaft housing sub-assembly with the bolt.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- Install the engine oil level dipstick.
- INSTALL IGNITION COIL ASSEMBLY
Refer to PROCEDURE - Step 2 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 2 [08/2023 - ] - INSTALL FUEL INJECTOR SEAL
Refer to PROCEDURE - Step 1 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 1 [08/2023 - ] - INSTALL INJECTOR VIBRATION INSULATOR
Refer to PROCEDURE - Step 2 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 2 [08/2023 - ] - INSTALL C-RING
Refer to PROCEDURE - Step 3 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 3 [08/2023 - ] - INSTALL NO. 1 FUEL INJECTOR BACK-UP RING
Refer to PROCEDURE - Step 4 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 4 [08/2023 - ] - INSTALL NO. 3 FUEL INJECTOR BACK-UP RING
Refer to PROCEDURE - Step 5 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 5 [08/2023 - ] - INSTALL NOZZLE HOLDER CLAMP
- INSTALL DIRECT FUEL INJECTOR ASSEMBLY
Refer to PROCEDURE - Step 7 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 7 [08/2023 - ] - INSTALL FUEL DELIVERY PIPE
Refer to PROCEDURE - Step 8 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 8 [08/2023 - ] - INSTALL PORT FUEL INJECTOR ASSEMBLY
Refer to PROCEDURE - Step 1 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 1 [08/2023 - ] - INSTALL NO. 5 ENGINE WIRE
- INSTALL INJECTOR VIBRATION INSULATOR
- INSTALL NO. 1 DELIVERY PIPE SPACER
Refer to PROCEDURE - Step 4 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 4 [08/2023 - ] - INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 5 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 5 [08/2023 - ] - INSTALL WIRE HARNESS CLAMP BRACKET
- INSTALL NO. 6 ENGINE WIRE
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- INSTALL SENSOR WIRE
- INSTALL NO. 7 WATER BY-PASS HOSE
- INSTALL FUEL PUMP LIFTER ASSEMBLY
Refer to PROCEDURE - Step 1 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 1 [08/2023 - ] - INSTALL FUEL PUMP SPACER GASKET
- TEMPORARILY INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY
Refer to PROCEDURE - Step 3 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 3 [08/2023 - ] - TEMPORARILY INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 4 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 4 [08/2023 - ] - INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY
Refer to PROCEDURE - Step 5 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 5 [08/2023 - ] - INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 6 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 6 [08/2023 - ] - CONNECT FUEL TUBE SUB-ASSEMBLY
Refer to PROCEDURE - Step 7 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 7 [08/2023 - ] - INSTALL FUEL PIPE CLAMP
- INSTALL NO. 1 INTAKE MANIFOLD TO HEAD GASKET
- INSTALL INTAKE MANIFOLD
Refer to PROCEDURE - Step 4 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 4 [08/2023 - ] - INSTALL NO. 2 WATER BY-PASS PIPE
- INSTALL NO. 3 WATER BY-PASS PIPE
- SET EGR VALVE ASSEMBLY
Refer to PROCEDURE - Step 1 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 1 [08/2023 - ] - CONNECT NO. 8 WATER BY-PASS HOSE
- CONNECT NO. 4 WATER BY-PASS HOSE
- INSTALL NO. 1 EGR COOLER GASKET
Refer to PROCEDURE - Step 3 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 3 [08/2023 - ] - INSTALL EGR VALVE GASKET
Refer to PROCEDURE - Step 4 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 4 [08/2023 - ] - INSTALL EGR COOLER ASSEMBLY
Refer to PROCEDURE - Step 5 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 5 [08/2023 - ] - CONNECT NO. 4 WATER BY-PASS HOSE
- CONNECT NO. 3 WATER BY-PASS HOSE
- INSTALL EGR VALVE ASSEMBLY
Refer to PROCEDURE - Step 9 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 9 [08/2023 - ] - INSTALL EGR INLET GASKET
- INSTALL EGR VALVE ADAPTER GASKET
- INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 12 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 12 [08/2023 - ] - INSTALL THROTTLE BODY GASKET
Refer to PROCEDURE - Step 1 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 1 [08/2023 - ] - CONNECT NO. 6 WATER BY-PASS HOSE
Refer to PROCEDURE - Step 2 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 2 [08/2023 - ] - INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY
Refer to PROCEDURE - Step 3 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 3 [08/2023 - ] - CONNECT NO. 5 WATER BY-PASS HOSE
Refer to PROCEDURE - Step 4 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 4 [08/2023 - ] - INSTALL EXHAUST MANIFOLD TO HEAD GASKET
- INSTALL EXHAUST MANIFOLD
Refer to PROCEDURE - Step 3 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 3 [08/2023 - ] - INSTALL MANIFOLD STAY
Refer to PROCEDURE - Step 4 [10/2022 - 08/2023] , or refer to PROCEDURE - Step 4 [08/2023 - ] - INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- INSTALL FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY)
*a Paint Mark *b 45° (Claw of Clip Location) *c Upper Side *d Front of Engine *e 2.0 to 7.0 mm (0.0787 to 0.276 in.) - - - Install the water hose clamp bracket with the 2 bolts as shown in the illustration.
Torque: 13 N.m (133 kgf/cm, 10 ft.lbf)
NOTE:Temporarily tighten the bolt (A), and then fully tighten the 2 bolts in the order of (B) and (A).
- Connect the flow shutting valve (water by-pass hose assembly) to the water by-pass outlet and slide the clip to secure it.NOTE:
- Make sure to slide the flow shutting valve (water by-pass hose assembly) until it contacts the hose stopper of the water by-pass outlet.
- Make sure that the claws of the clip are within the location shown in the illustration.
- Install the flow shutting valve (water by-pass hose assembly) with the bolt.
Torque: 19 N.m (194 kgf/cm, 14 ft.lbf)
- Install the water hose clamp bracket with the 2 bolts as shown in the illustration.
- INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY
*a 45° (Claw of Clip Location) *b Paint Mark *c Upper Side *d Front of Engine *e 2.0 to 7.0 mm (0.0787 to 0.276 in.) - - - Connect the No. 2 water by-pass pipe sub-assembly to the water by-pass outlet and slide the clip to secure it.NOTE:
- Make sure to slide the No. 2 water by-pass pipe sub-assembly until it contacts the hose stopper of the water by-pass outlet.
- Make sure that the claws of the clip are within the location shown in the illustration.
- Install the No. 2 water by-pass pipe sub-assembly with the bolt.
Torque: 19 N.m (194 kgf/cm, 14 ft.lbf)
- Connect the No. 2 water by-pass pipe sub-assembly to the water by-pass outlet and slide the clip to secure it.
- INSTALL COMPRESSOR WITH MOTOR ASSEMBLY
-
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Bolt Nut - Using an E8 "TORX" socket wrench, temporarily install the compressor with motor assembly with the 2 stud bolts.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- Install the compressor with motor assembly with the bolt and 2 nuts in the order shown in the illustration.
Torque: 24.5 N.m (250 kgf/cm, 18 ft.lbf)
- Using an E8 "TORX" socket wrench, temporarily install the compressor with motor assembly with the 2 stud bolts.
-
- INSTALL DRIVE SHAFT BEARING BRACKET
Torque: 63.7 N.m (650 kgf/cm, 47 ft.lbf)