LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2024 >> NX 250 FWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 56 (Engine Mechanical System - Service Information (2 Of 4)) >> Cylinder Head Gasket >> Installation [03/2022 - ] >> Procedure

Installation [03/2022 - ]: Procedure

WARNING: This page is about a different car, the 2025 Lexus NX 350h, 2024 Lexus NX 350h, 2023 Lexus NX 350h, and 2022 Lexus NX 350h. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL CYLINDER HEAD GASKET 
    1. GTY1075072Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Lot No. - -
      Front of Engine - -
      1. Clean the cylinder block sub-assembly and cylinder head sub-assembly with solvent.
      2. Place a new cylinder head gasket on the cylinder block sub-assembly as shown in the illustration.
        NOTE:
        • Make sure that the cylinder head gasket is installed in the correct orientation.
        • Remove any oil from the contact surfaces.
  2. INSTALL CYLINDER HEAD SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 19 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 19 [03/2024 - ]
  3. INSTALL NO. 2 CAMSHAFT 
    Refer to PROCEDURE - Step 23 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 23 [03/2024 - ]
  4. INSTALL CAMSHAFT 
    Refer to PROCEDURE - Step 24 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 24 [03/2024 - ]
  5. INSTALL CAMSHAFT BEARING CAP 
    Refer to PROCEDURE - Step 25 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 25 [03/2024 - ]
  6. INSTALL VALVE STEM CAP 
    Refer to PROCEDURE - Step 26 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 26 [03/2024 - ]
  7. INSTALL VALVE LASH ADJUSTER ASSEMBLY 
    Refer to PROCEDURE - Step 27 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 27 [03/2024 - ]
  8. INSTALL NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 28 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 28 [03/2024 - ]
  9. INSTALL CAMSHAFT HOUSING SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 29 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 29 [03/2024 - ]
  10. INSTALL FUEL PUMP LIFTER GUIDE 
    Refer to PROCEDURE - Step 30 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 30 [03/2024 - ]
  11. INSTALL TIMING CHAIN COVER ASSEMBLY 
    Refer to PROCEDURE - Step 33 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 33 [03/2024 - ]
  12. INSTALL CAMSHAFT TIMING EXHAUST GEAR ASSEMBLY 
    Refer to PROCEDURE - Step 34 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 34 [03/2024 - ]
  13. SET NO. 1 CYLINDER TO TDC (COMPRESSION) 
    Refer to PROCEDURE - Step 35 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 35 [03/2024 - ]
  14. INSTALL NO. 1 CHAIN VIBRATION DAMPER 

    Refer to PROCEDURE - Step 36 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 36 [03/2024 - ]

  15. INSTALL CHAIN TENSIONER SLIPPER 

    Refer to PROCEDURE - Step 37 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 37 [03/2024 - ]

  16. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY 
    Refer to PROCEDURE - Step 38 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 38 [03/2024 - ]
  17. INSTALL CHAIN SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 39 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 39 [03/2024 - ]
  18. INSTALL CAMSHAFT TIMING GEAR ASSEMBLY 
    Refer to PROCEDURE - Step 40 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 40 [03/2024 - ]
  19. INSTALL OIL PUMP DRIVE CHAIN SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 41 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 41 [03/2024 - ]
  20. SET NO. 1 CYLINDER TO TDC (COMPRESSION) 
    Refer to PROCEDURE - Step 37 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 37 [03/2024 - ]
  21. INSTALL NO. 2 TIMING CHAIN COVER ASSEMBLY 
    Refer to PROCEDURE - Step 43 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 43 [03/2024 - ]
  22. INSTALL TIMING CHAIN COVER OIL SEAL 
    See step  1
  23. INSTALL SPARK PLUG TUBE GASKET 
    Refer to PROCEDURE - Step 46 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 46 [03/2024 - ]
  24. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 47 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 47 [03/2024 - ]
  25. INSTALL WATER OUTLET PIPE GASKET 
  26. INSTALL WATER BY-PASS OUTLET 
    Refer to PROCEDURE - Step 49 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 49 [03/2024 - ]
  27. INSTALL WATER OUTLET GASKET 
  28. INSTALL WATER OUTLET 
    Refer to PROCEDURE - Step 51 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 51 [03/2024 - ]
  29. INSTALL CRANKSHAFT PULLEY ASSEMBLY 
    Refer to PROCEDURE - Step 52 [03/2022 - 03/2024] , or refer to PROCEDURE - Step 52 [03/2024 - ]
  30. CONNECT NO. 2 WATER BY-PASS HOSE 
  31. CONNECT NO. 1 WATER BY-PASS HOSE 
  32. INSTALL CAM TIMING CONTROL MOTOR O-RING 
    Refer to PROCEDURE - Step 1
  33. INSTALL CAM TIMING CONTROL MOTOR WITH EDU ASSEMBLY 
    Refer to PROCEDURE - Step 2
  34. INSTALL CAM TIMING OIL CONTROL SOLENOID O-RING 
    Refer to PROCEDURE - Step 1
  35. INSTALL CAM TIMING OIL CONTROL SOLENOID ASSEMBLY 
    Refer to PROCEDURE - Step 2
  36. INSTALL OIL PRESSURE CONTROL VALVE ASSEMBLY 
    Refer to PROCEDURE - Step 1
  37. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE 
    Refer to PROCEDURE - Step 2
  38. INSTALL IGNITION COIL ASSEMBLY 
    Refer to PROCEDURE - Step 2
  39. INSTALL FUEL INJECTOR SEAL 
    Refer to PROCEDURE - Step 1
  40. INSTALL INJECTOR VIBRATION INSULATOR 
    Refer to PROCEDURE - Step 2
  41. INSTALL C-RING 
    Refer to PROCEDURE - Step 3
  42. INSTALL NO. 1 FUEL INJECTOR BACK-UP RING 
    Refer to PROCEDURE - Step 4
  43. INSTALL NO. 3 FUEL INJECTOR BACK-UP RING 
    Refer to PROCEDURE - Step 5
  44. INSTALL NOZZLE HOLDER CLAMP 
  45. INSTALL DIRECT FUEL INJECTOR ASSEMBLY 
    Refer to PROCEDURE - Step 7
  46. INSTALL FUEL DELIVERY PIPE 
    Refer to PROCEDURE - Step 8
  47. CONNECT WIRE HARNESS 
  48. INSTALL PORT FUEL INJECTOR ASSEMBLY 
    Refer to PROCEDURE - Step 1
  49. INSTALL NO. 5 ENGINE WIRE 
  50. INSTALL INJECTOR VIBRATION INSULATOR 
  51. INSTALL NO. 1 DELIVERY PIPE SPACER 
    Refer to PROCEDURE - Step 4
  52. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 5
  53. INSTALL NO. 7 WATER BY-PASS HOSE 
  54. INSTALL FUEL PUMP LIFTER ASSEMBLY 
    Refer to PROCEDURE - Step 1
  55. INSTALL FUEL PUMP SPACER GASKET 
  56. TEMPORARILY INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY 
    Refer to PROCEDURE - Step 3
  57. TEMPORARILY INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 4
  58. INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY 
    Refer to PROCEDURE - Step 5
  59. INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 6
  60. CONNECT FUEL TUBE SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 7
  61. INSTALL FUEL PIPE CLAMP 
  62. INSTALL NO. 1 INTAKE MANIFOLD TO HEAD GASKET 
  63. INSTALL INTAKE MANIFOLD 
    Refer to PROCEDURE - Step 4
  64. INSTALL NO. 2 WATER BY-PASS PIPE 
    Refer to PROCEDURE - Step 31
  65. INSTALL NO. 3 WATER BY-PASS PIPE 
    Refer to PROCEDURE - Step 32
  66. SET EGR VALVE ASSEMBLY 
    Refer to PROCEDURE - Step 1
  67. CONNECT NO. 8 WATER BY-PASS HOSE 
  68. CONNECT NO. 4 WATER BY-PASS HOSE 
  69. INSTALL NO. 1 EGR COOLER GASKET 
    Refer to PROCEDURE - Step 3
  70. INSTALL EGR VALVE GASKET 
    Refer to PROCEDURE - Step 4
  71. INSTALL EGR COOLER ASSEMBLY 
    Refer to PROCEDURE - Step 5
  72. CONNECT NO. 4 WATER BY-PASS HOSE 
  73. CONNECT NO. 3 WATER BY-PASS HOSE 
  74. INSTALL EGR VALVE ASSEMBLY 
    Refer to PROCEDURE - Step 9
  75. INSTALL EGR INLET GASKET 
  76. INSTALL EGR VALVE ADAPTER GASKET 
  77. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 12
  78. INSTALL THROTTLE BODY GASKET 
    Refer to PROCEDURE - Step 1
  79. CONNECT NO. 6 WATER BY-PASS HOSE 
    Refer to PROCEDURE - Step 2
  80. INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY 
    Refer to PROCEDURE - Step 3
  81. CONNECT NO. 5 WATER BY-PASS HOSE 
    Refer to PROCEDURE - Step 4
  82. INSTALL EXHAUST MANIFOLD TO HEAD GASKET 
  83. INSTALL EXHAUST MANIFOLD (TWC: Front Catalyst) 
    Refer to PROCEDURE - Step 3
  84. INSTALL MANIFOLD STAY 
    Refer to PROCEDURE - Step 6
  85. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR 

    Refer to PROCEDURE - Step 52

  86. INSTALL FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY) 
    Refer to PROCEDURE - Step 53
  87. INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY 
    Refer to PROCEDURE - Step 54
  88. INSTALL COMPRESSOR WITH MOTOR ASSEMBLY 
    Refer to PROCEDURE - Step 55
  89. INSTALL ENGINE HANGERS 
    See step  45 [11/2021 - 03/2024], or see step  43 [03/2024 - ]
  90. REMOVE ENGINE ASSEMBLY FROM ENGINE STAND