LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2021 >> LC 500 2D Convertible >> Repair and Diagnosis >> Maintenance >> Procedures >> Maintenance - Service Information (Convertible) >> Drive Belt >> Installation [07/2020 - ] >> Procedure

Installation [07/2020 - ]: Procedure

  1. INSTALL FAN AND GENERATOR V BELT 

    HINT: 

    When re-using the fan and generator V belt, check the entire circumference of the belt for wear and cracks on the ribs and rear side. Replace belts where wear and cracks have advanced to the wire core and belts with missing rib rubber.

    1. Install the fan and generator V belt as shown in the illustration.
      Fig 1: Engine Drive Belt Routing Diagram
      GTY495836Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *1 Engine Water Pump Assembly
      *2 Scavenging Pump Assembly
      *3 No. 2 Idler Pulley Sub-assembly
      *4 Compressor with Pulley Assembly
      *5 Crankshaft Pulley
      *6 V-ribbed Belt Tensioner Assembly
      *7 Generator Assembly
      NOTE:

      Hook the back surface side of the fan and generator V belt onto the drive belt tensioner assembly and scavenging pump assembly.

    2. Rotate the V-ribbed belt tensioner assembly counterclockwise, and then remove the 5 mm hexagon wrench.
    3. Check that the fan and generator V belt is properly set to each pulley.
      GTY511950Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Correct
      *b Incorrect
    4. Start the engine and check that the fan and generator V belt turns smoothly and no abnormal noise occurs.
  2. INSTALL INTAKE AIR CONNECTOR PIPE 

    Refer to PROCEDURE - Step 27 [07/2020 - 05/2023] , or refer to PROCEDURE - Step 27 [05/2023 - ]

  3. INSTALL AIR CLEANER HOSE ASSEMBLY 

    Refer to PROCEDURE - Step 2

  4. CONNECT NO. 3 PCV HOSE 

    Refer to PROCEDURE - Step 4

  5. CONNECT NO. 2 PCV HOSE 

    Refer to PROCEDURE - Step 3

  6. INSTALL LOWER RADIATOR AIR DEFLECTOR 

    Refer to PROCEDURE - Step 2 [07/2020 - 05/2023] , or refer to PROCEDURE - Step 2 [05/2023 - ]

  7. INSTALL RADIATOR SUPPORT TO FRAME SEAL RH 

    Refer to PROCEDURE - Step 4 [07/2020 - 05/2023] , or refer to PROCEDURE - Step 4 [05/2023 - ]

  8. INSTALL RADIATOR SUPPORT TO FRAME SEAL LH 

    Refer to PROCEDURE - Step 3 [07/2020 - 05/2023] , or refer to PROCEDURE - Step 3 [05/2023 - ]

  9. INSTALL V-BANK COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 147 [07/2020 - 05/2023] , or refer to PROCEDURE - Step 150 [05/2023 - ]