Installation [07/2020 - 05/2023]: Procedure
- INSTALL INTAKE AIR SURGE TANK ASSEMBLY
- Install 2 new No. 1 intake manifold to head gaskets to the cylinder head sub-assembly.
- Temporarily install the intake air surge tank assembly to the cylinder head sub-assembly with the 8 bolts and 2 nuts.
- Tighten the 8 bolts and 2 nuts in the order shown in the illustration.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Bolt Nut Torque: 21 N.m (214 kgf/cm, 15 ft.lbf)
- Connect the wire harness clamp bracket to the intake air surge tank assembly with the bolt.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- INSTALL WIRE HARNESS CLAMP BRACKET
- Install the 3 wire harness clamp brackets with the 4 bolts.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- Install the 3 wire harness clamp brackets with the 4 bolts.
- CONNECT NO. 1 FUEL PIPE SUB-ASSEMBLY
- Connect the No. 1 fuel pipe sub-assembly to the intake air surge tank assembly with the bolt.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- Connect the No. 1 fuel pipe sub-assembly to the intake air surge tank assembly with the bolt.
- INSTALL PORT FUEL INJECTOR ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL INJECTOR VIBRATION INSULATOR
Refer to PROCEDURE - Step 2
- INSTALL NO. 1 DELIVERY PIPE SPACER
Refer to PROCEDURE - Step 3
- INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 4
- INSTALL NO. 2 FUEL DELIVERY PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 5
- INSTALL FUEL TUBE SUB-ASSEMBLY
Refer to PROCEDURE - Step 6
- INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
- Install the water by-pass pipe sub-assembly to the intake air surge tank assembly with the 2 bolts.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- Connect the heater water inlet hose to the water by-pass pipe sub-assembly and slide the clip to secure the hose.
- Connect the heater water outlet hose to the water by-pass pipe sub-assembly and slide the clip to secure the hose.
- Connect the No. 5 water by-pass hose to the water by-pass pipe sub-assembly and slide the clip to secure the hose.
- Connect the water by-pass hose to the water by-pass pipe sub-assembly and slide the clip to secure the hose.
- Connect the No. 3 water by-pass hose to the water by-pass pipe sub-assembly and slide the clip to secure the hose.
- Install the water by-pass pipe sub-assembly to the intake air surge tank assembly with the 2 bolts.
- INSTALL INJECTOR DRIVER BRACKET
- Install the 2 injector driver brackets to the intake air surge tank assembly with the 4 bolts.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- Install the 2 injector driver brackets to the intake air surge tank assembly with the 4 bolts.
- CONNECT PCV HOSE
- Connect the PCV hose to the intake air surge tank assembly and slide the clip to secure the hose.
- INSTALL FUEL VAPOR FEED HOSE
- Install the fuel vapor feed hose to the intake air surge tank assembly and slide the clip to secure the hose.
- CONNECT VACUUM HOSE SUB-ASSEMBLY
- Attach the 2 clamps and connect the vacuum hose sub-assembly to the intake air surge tank assembly.
- CONNECT NO. 5 ENGINE WIRE
- Attach the 4 clamps to connect the No. 5 engine wire to the intake air surge tank assembly.
- CONNECT ENGINE WIRE
- Connect the 7 connectors.
- Attach the 6 clamps.
- Install the 2 bolts.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- Connect the 5 connectors.
*a Bolt (A) *b Bolt (B) Bolt Connector Nut - Attach the 4 clamps.
- Install the bolt (A), (B) and nut.
for bolt (A)
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
for bolt (B) and nut
Torque: 12 N.m (122 kgf/cm, 9 ft.lbf)
- Attach the fuel tube sub-assembly to the engine wire.
- Connect the 17 connectors.
- Attach the 4 clamps.
- Install the 2 bolts and 4 nuts.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY
Refer to PROCEDURE - Step 138
- INSTALL FRONT SUSPENSION MEMBER BRACE SUB-ASSEMBLY LH
Refer to PROCEDURE - Step 139
- INSTALL FRONT SUSPENSION MEMBER BRACE SUB-ASSEMBLY RH
Refer to PROCEDURE - Step 140
- INSTALL FRONT FENDER SEAL LH
See step 22
- INSTALL FRONT FENDER SEAL RH
See step 21
- INSTALL INJECTOR DRIVER
Refer to PROCEDURE - Step 1
- INSTALL PURGE VSV
Refer to PROCEDURE - Step 1
- INSTALL AIR CLEANER HOSE CLAMP
- Attach the clamp and install the air cleaner hose clamp.
- INSTALL NO. 2 INTAKE AIR CONNECTOR PIPE
- Install the No. 2 intake air connector pipe to the No. 3 intake air connector pipe, and slide the clamp to secure the hose.
- Install the bolt.
Torque: 5.0 N.m (51 kgf/cm, 44 in.lbf)
- Attach the air cleaner hose clamp.
- INSTALL INTAKE AIR SOUND CREATOR
- Install the intake air sound creator with the 2 bolts and hose clamp.
for bolt
Torque: 5.0 N.m (51 kgf/cm, 44 in.lbf)
for hose clamp
Torque: 2.0 N.m (20 kgf/cm, 18 in.lbf)
- Install the intake air sound creator with the 2 bolts and hose clamp.
- INSTALL INTAKE AIR CONNECTOR PIPE
- Install the intake air connector pipe with the bolt and hose clamp.
for bolt
Torque: 5.0 N.m (51 kgf/cm, 44 in.lbf)
for hose clamp
Torque: 4.0 N.m (41 kgf/cm, 35 in.lbf)
- Install the intake air connector pipe with the bolt and hose clamp.
- INSTALL AIR CLEANER WITH ELEMENT ASSEMBLY LH
Refer to PROCEDURE - Step 102
- INSTALL AIR CLEANER WITH ELEMENT ASSEMBLY RH
Refer to PROCEDURE - Step 101
- INSTALL RADIATOR SUPPORT TO CROSSMEMBER BRACE SUB-ASSEMBLY RH
Refer to PROCEDURE - Step 14
- INSTALL RADIATOR SUPPORT TO CROSSMEMBER BRACE SUB-ASSEMBLY LH
Refer to PROCEDURE - Step 15
- INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY
Refer to INSTALLATION [07/2020 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to PROCEDURE - Step 2
NOTE:When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [07/2020 - 05/2023]
- INSPECT FOR FUEL LEAK
Refer to PROCEDURE - Step 1