LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2021 >> LC 500 2D Convertible >> Repair and Diagnosis >> Heating, Ventilation & A/C (HVAC) >> HVAC Control Systems >> Heating / Air Conditioning System - Service Information (Convertible) (2 Of 2) >> Air Conditioning Panel >> Installation [07/2020 - 05/2023] >> Procedure

Installation [07/2020 - 05/2023]: Procedure

  1. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY 
    1. Connect the 3 connectors.
      GTY964389Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Attach the clamp.
    3. Attach the claw and clip to install the integration control and panel assembly.
      GTY963240Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL NO. 1 INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 25 [07/2020 - 10/2022] , or refer to PROCEDURE - Step 25 [10/2022 - 05/2023]

  3. INSTALL HOOD LOCK CONTROL LEVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 26 [07/2020 - 10/2022] , or refer to PROCEDURE - Step 26 [10/2022 - 05/2023]

  4. INSTALL NO. 2 INSTRUMENT PANEL GARNISH SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 27 [07/2020 - 10/2022] , or refer to PROCEDURE - Step 27 [10/2022 - 05/2023]

  5. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY 
    1. Move the upper console panel sub-assembly to the installation position diagonally at a slightly slanted angle from the rear upper of the vehicle.
      NOTE:

      Hold the areas shown in the illustration, lift the upper console panel sub-assembly and while inserting a portion of the claw into the mating hole move it to the installation position.

      GTY793487Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      Place Hands Here
      Install in this Direction (1)
      Install in this Direction (2)
    2. Attach the claw.
      GTY963899Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Slide toward the front of the vehicle to insert the guide and attach the claw.
      GTY963900Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      Install in this Direction
    4. Fold the front seatback (RH side) forward and attach the clip and claw.
      GTY963887Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    5. Return the front seatback (RH side) to the original position and install the bolt.
      GTY817890Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    6. Install the upper console panel sub-assembly with the 2 bolts and 2 screws.
      GTY778124Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      Bolt
      Screw
  6. INSTALL BOX PANEL SUB-ASSEMBLY 
    1. Slide toward the box panel sub-assembly front of the vehicle and attach the claw.
      GTY782933Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      Install in this Direction
    2. Attach the clip.
      GTY963507Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Attach the clip.
      GTY963510Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Install the box panel sub-assembly with the 3 bolts and 2 screws.
      GTY787389Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      Bolt
      Screw
  7. INSTALL NO. 1 GLOVE COMPARTMENT PANEL 

    Refer to PROCEDURE - Step 29 [07/2020 - 10/2022] , or refer to PROCEDURE - Step 29 [10/2022 - 05/2023]

  8. INSTALL UPPER CONSOLE BOX 

    Refer to PROCEDURE - Step 6

  9. INSTALL SHIFTING HOLE COVER ASSEMBLY 

    Refer to PROCEDURE - Step 9

  10. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 1

  11. INSTALL NO. 1 INDOOR ELECTRICAL KEY ANTENNA ASSEMBLY 

    Refer to INSTALLATION [07/2020 - ]

  12. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 30 [07/2020 - 10/2022] , or refer to PROCEDURE - Step 30 [10/2022 - 05/2023]

  13. INSTALL FRONT DOOR NO. 2 OPENING TRIM COVER LH 

    Refer to PROCEDURE - Step 31 [07/2020 - 10/2022] , or refer to PROCEDURE - Step 31 [10/2022 - 05/2023]

  14. INSTALL FRONT DOOR OPENING TRIM COVER LH 

    Refer to PROCEDURE - Step 33 [07/2020 - 10/2022] , or refer to PROCEDURE - Step 33 [10/2022 - 05/2023]

  15. INSTALL FRONT DOOR SCUFF PLATE LH 

    Refer to PROCEDURE - Step 35 [07/2020 - 10/2022] , or refer to PROCEDURE - Step 35 [10/2022 - 05/2023]