Installation [10/2018 - 07/2022]: Procedure
- INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
- Temporarily install the park/neutral position switch assembly to the transaxle case sub-assembly with the 2 bolts.
- Temporarily install the transmission control shaft lever to the manual valve lever shaft.
- Turn the transmission control shaft lever clockwise until it stops, then turn it counterclockwise 2 notches.
*a N - Remove the transmission control shaft lever from the manual valve lever shaft.
- Align the protrusions of the park/neutral position switch assembly as shown in the illustration.
*a Protrusion - Hold the park/neutral position switch assembly in that position and tighten the 2 bolts.
Torque: 5.4 N.m (55 kgf/cm, 48 in.lbf)
- Install the transmission control shaft lever to the manual valve lever shaft with the washer and nut.
Torque: 12.7 N.m (130 kgf/cm, 9 ft.lbf)
NOTE:Be careful of the direction of the transmission control shaft lever.
- Connect the park/neutral position switch connector.
- CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY NOTE:
Before connecting the transmission control cable assembly, check that the shift lever is in N.
- Turn the transmission control shaft lever clockwise until it stops, then turn it counterclockwise 2 notches.
*a N - Install the transmission control cable assembly to the No. 1 transmission control cable bracket with a new clip.
- Connect the transmission control cable assembly to the transmission control shaft lever as shown in the illustration.
*a Correct *b Incorrect
- Turn the transmission control shaft lever clockwise until it stops, then turn it counterclockwise 2 notches.
- INSTALL BATTERY CLAMP
See step [10/2018 - 08/2021] 35 , or see step [08/2021 - 07/2022] 34
- INSTALL ECM
Refer to INSTALLATION [10/2018 - 07/2022]
- INSTALL AIR CLEANER CASE SUB-ASSEMBLY
Refer to PROCEDURE - Step 5
- INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE
Refer to PROCEDURE - Step 3
- INSTALL NO. 1 AIR CLEANER INLET
Refer to PROCEDURE - Step 18 [10/2018 - 10/2019] , or refer to PROCEDURE - Step 17 [10/2019 - 07/2022]
- INSTALL RADIATOR SUPPORT OPENING COVER
Refer to PROCEDURE - Step 2
- INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 41 [10/2018 - 08/2021] , or refer to PROCEDURE - Step 41 [08/2021 - 07/2022]
- INSTALL AUXILIARY BATTERY
Refer to PROCEDURE - Step 1
- CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
Refer to PROCEDURE - Step 2
NOTE:When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [10/2018 - 07/2022]
- INSPECT SHIFT LEVER POSITION
See step 2
- ADJUST SHIFT LEVER POSITION
See step 3
- INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
See step 2
- ADJUST PARK/NEUTRAL POSITION SWITCH ASSEMBLY
See step 5