LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2019 >> ES 350 Luxury >> Repair and Diagnosis >> External Pages >> Different car >> Section 51 (Engine Mechanical System (A25A-FXS) - Service Information (1 Of 3)) >> Cylinder Head Gasket >> Installation [06/2018 - 08/2021] >> Procedure

Installation [06/2018 - 08/2021]: Procedure

WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2024 Lexus ES 300h, 2023 Lexus ES 300h, 2022 Lexus ES 300h, 2021 Lexus ES 300h, and 2020 Lexus ES 300h. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL CYLINDER HEAD GASKET 
    1. Clean the cylinder block sub-assembly and cylinder head sub-assembly with solvent.
    2. Place a new cylinder head gasket on the cylinder block sub-assembly as shown in the illustration.
      GTY767586Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Lot No.
      Front of Engine
      NOTE:
      • Make sure that the cylinder head gasket is installed in the correct orientation.
      • Remove any oil from the contact surfaces.
  2. INSTALL CYLINDER HEAD SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 19 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 19 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 19 [10/2019 - 08/2021]

  3. INSTALL NO. 2 CAMSHAFT 

    Refer to PROCEDURE - Step 21 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 21 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 22 [10/2019 - 08/2021]

  4. INSTALL CAMSHAFT 

    Refer to PROCEDURE - Step 22 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 22 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 23 [10/2019 - 08/2021]

  5. INSTALL CAMSHAFT BEARING CAP 

    Refer to PROCEDURE - Step 23 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 23 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 24 [10/2019 - 08/2021]

  6. INSTALL VALVE STEM CAP 

    Refer to PROCEDURE - Step 24 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 24 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 25 [10/2019 - 08/2021]

  7. INSTALL VALVE LASH ADJUSTER ASSEMBLY 

    Refer to PROCEDURE - Step 25 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 25 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 26 [10/2019 - 08/2021]

  8. INSTALL NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 26 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 26 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 27 [10/2019 - 08/2021]

  9. INSTALL CAMSHAFT HOUSING SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 27 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 27 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 28 [10/2019 - 08/2021]

  10. INSTALL FUEL PUMP LIFTER GUIDE 

    Refer to PROCEDURE - Step 28 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 28 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 29 [10/2019 - 08/2021]

  11. INSTALL TIMING CHAIN COVER ASSEMBLY 

    Refer to PROCEDURE - Step 31 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 31 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 32 [10/2019 - 08/2021]

  12. INSTALL CAMSHAFT TIMING EXHAUST GEAR ASSEMBLY 

    Refer to PROCEDURE - Step 32 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 32 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 33 [10/2019 - 08/2021]

  13. SET NO. 1 CYLINDER TO TDC (COMPRESSION) 

    Refer to PROCEDURE - Step 33 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 40 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 41 [10/2019 - 08/2021]

  14. INSTALL NO. 1 CHAIN VIBRATION DAMPER 

    Refer to PROCEDURE - Step 34 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 34 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 35 [10/2019 - 08/2021]

  15. INSTALL CHAIN TENSIONER SLIPPER 

    Refer to PROCEDURE - Step 35 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 35 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 36 [10/2019 - 08/2021]

  16. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY 

    Refer to PROCEDURE - Step 36 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 36 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 37 [10/2019 - 08/2021]

  17. INSTALL CHAIN SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 37 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 37 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 38 [10/2019 - 08/2021]

  18. INSTALL CAMSHAFT TIMING GEAR ASSEMBLY 

    Refer to PROCEDURE - Step 38 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 38 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 39 [10/2019 - 08/2021]

  19. INSTALL OIL PUMP DRIVE CHAIN SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 39 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 39 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 40 [10/2019 - 08/2021]

  20. SET NO. 1 CYLINDER TO TDC (COMPRESSION) 

    Refer to PROCEDURE - Step 28 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 30 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 28 [10/2019 - ]

  21. INSTALL NO. 2 TIMING CHAIN COVER ASSEMBLY 

    Refer to PROCEDURE - Step 41 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 41 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 42 [10/2019 - 08/2021]

  22. INSTALL TIMING CHAIN COVER OIL SEAL 

    See step  1

  23. INSTALL SPARK PLUG TUBE GASKET 

    Refer to PROCEDURE - Step 44 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 44 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 45 [10/2019 - 08/2021]

  24. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 45 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 45 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 46 [10/2019 - 08/2021]

  25. INSTALL WATER BY-PASS OUTLET SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 46 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 46 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 47 [10/2019 - 08/2021]

  26. INSTALL WATER OUTLET 

    Refer to PROCEDURE - Step 47 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 47 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 48 [10/2019 - 08/2021]

  27. INSTALL CRANKSHAFT PULLEY ASSEMBLY 

    Refer to PROCEDURE - Step 48 [06/2018 - 07/2019] , or refer to PROCEDURE - Step 48 [07/2019 - 10/2019] , or refer to PROCEDURE - Step 49 [10/2019 - 08/2021]

  28. INSTALL CAM TIMING CONTROL MOTOR O-RING 

    Refer to PROCEDURE - Step 1

  29. INSTALL CAM TIMING CONTROL MOTOR WITH EDU ASSEMBLY 

    Refer to PROCEDURE - Step 2

  30. INSTALL O-RING 

    Refer to PROCEDURE - Step 1

  31. INSTALL CAM TIMING OIL CONTROL SOLENOID ASSEMBLY 

    Refer to PROCEDURE - Step 2

  32. INSTALL OIL PRESSURE CONTROL VALVE ASSEMBLY 

    Refer to PROCEDURE - Step 1

  33. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE 

    Refer to PROCEDURE - Step 2

  34. INSTALL IGNITION COIL ASSEMBLY 

    Refer to PROCEDURE - Step 2

  35. INSTALL DIRECT FUEL INJECTOR ASSEMBLY 

    Refer to PROCEDURE - Step 2

  36. INSTALL FUEL DELIVERY PIPE 

    Refer to PROCEDURE - Step 3

  37. INSTALL PORT FUEL INJECTOR ASSEMBLY 

    Refer to PROCEDURE - Step 1

  38. INSTALL NO. 5 ENGINE WIRE 

    Refer to PROCEDURE - Step 2

  39. INSTALL INJECTOR VIBRATION INSULATOR 

    Refer to PROCEDURE - Step 3

  40. INSTALL NO. 1 DELIVERY PIPE SPACER 

    Refer to PROCEDURE - Step 4

  41. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 5

  42. INSTALL NO. 7 WATER BY-PASS HOSE 

    Refer to PROCEDURE - Step 14

  43. TEMPORARILY INSTALL FUEL PUMP ASSEMBLY (for High Pressure) 

    Refer to PROCEDURE - Step 1

  44. TEMPORARILY INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 2

  45. INSTALL FUEL PUMP ASSEMBLY (for High Pressure) 

    Refer to PROCEDURE - Step 3

  46. INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 18

  47. CONNECT FUEL TUBE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 6

  48. INSTALL NO. 1 INTAKE MANIFOLD TO HEAD GASKET 

    Refer to PROCEDURE - Step 3

  49. INSTALL INTAKE MANIFOLD 

    Refer to PROCEDURE - Step 4

  50. INSTALL NO. 2 WATER BY-PASS PIPE 

    Refer to PROCEDURE - Step 22

  51. INSTALL NO. 3 WATER BY-PASS PIPE 

    Refer to PROCEDURE - Step 23

  52. INSTALL EGR VALVE ASSEMBLY 

    Refer to PROCEDURE - Step 24

  53. INSTALL NO. 4 WATER BY-PASS HOSE 

    Refer to PROCEDURE - Step 25

  54. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 2

  55. INSTALL EGR COOLER ASSEMBLY 

    Refer to PROCEDURE - Step 27

  56. INSTALL THROTTLE BODY GASKET 

    Refer to PROCEDURE - Step 1

  57. INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY 

    Refer to PROCEDURE - Step 2

  58. INSTALL EXHAUST MANIFOLD (TWC: Front Catalyst) 

    Refer to PROCEDURE - Step 2

  59. INSTALL MANIFOLD STAY 

    Refer to PROCEDURE - Step 3

  60. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR 

    Refer to PROCEDURE - Step 32

  61. INSTALL FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY) 

    Refer to PROCEDURE - Step 33

  62. INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 34

  63. INSTALL COMPRESSOR WITH MOTOR ASSEMBLY 

    Refer to PROCEDURE - Step 35

  64. INSTALL ENGINE HANGERS 

    See step  39[06/2018 - 08/2020], or see step  39[08/2020 - 08/2021]

  65. REMOVE ENGINE ASSEMBLY FROM ENGINE STAND 

    Refer to INSTALLATION [06/2018 - 08/2021]