DTC P0796: Pressure Control Solenoid "C" Performance (Shift Solenoid Valve SL3) [11/2021 - ]: Procedure
- CHECK DTC OUTPUT
- Connect the Techstream to the DLC3.
- Turn the engine switch on (IG).
- Turn the Techstream on.
- Enter the following menus: Powertrain / ECT / Trouble Codes.
Powertrain > ECT > Trouble Codes
- Read the DTCs using the Techstream.
Result
Result Proceed to Only DTCs P0771, P0796 and P2714 are output A Only DTCs P0796 and P2714 are output B Only DTCs P0796, P2714 and P2808 are output C P0771, P0796, P2714, and other DTCs are output D HINT:
If any DTCs other than P0771, P0776 and P2714 are output, perform troubleshooting for those DTCs first.
Result:
B
See step 8
Result:
C
See step 9
Result:
D
GO TO DTC CHART. Refer to DIAGNOSTIC TROUBLE CODE CHART [11/2021 - ]
Result:
A
See step 2
- CLEAR DTC AND PERFORM STALL SPEED TEST
- Clear the DTCs.
HINT:
Write down the currently output DTCs before clearing them.
Powertrain > ECT > Clear DTCs
- Perform the stall speed test.
Refer to MECHANICAL SYSTEM TESTS [11/2021 - ]
Result
Result Proceed to Stall speed test can be performed A Stall speed test cannot be performed B
Result:
B
See step 7
Result:
A
See step 3
- Clear the DTCs.
- INSPECT SHIFT SOLENOID VALVE SR
- Remove the shift solenoid valve SR.
*a Shift Solenoid Valve SR Refer to DISASSEMBLY [11/2021 - ]
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition Terminal of shift solenoid valve SR connector - Shift solenoid valve SR body 20°C (68°F) 11 to 15 Ω - Connect a positive (+) lead from the battery to the terminal of the solenoid valve connector, and a negative (-) lead to the solenoid body. Check that the valve moves and makes an operating sound.
OK
Valve moves and makes an operating sound.
Result
Proceed to OK NG
Result:
NG
REPLACE SHIFT SOLENOID VALVE SR. Refer to COMPONENTS [11/2021 - ]
Result:
OK
See step 4
- Remove the shift solenoid valve SR.
- INSPECT SHIFT SOLENOID VALVE SL3
- Remove the shift solenoid valve SL3.
*a Component without harness connected
(Shift Solenoid Valve SL3)Refer to DISASSEMBLY [11/2021 - ]
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition Terminal 1 of the shift solenoid valve SL3 - Terminal 2 20°C (68°F) 5.0 to 5.6 Ω - Connect a positive (+) lead from the battery with a 21 W bulb to terminal 2 and a negative (-) lead to terminal 1 of the solenoid valve connector. Check that the valve moves and makes an operating sound.
OK
Valve moves and makes an operating sound.
Result
Proceed to OK NG
Result:
NG
REPLACE SHIFT SOLENOID VALVE SL3. Refer to COMPONENTS [11/2021 - ]
Result:
OK
See step 5
- Remove the shift solenoid valve SL3.
- INSPECT TRANSMISSION VALVE BODY ASSEMBLY
- Check the transmission valve body assembly.
Refer to REMOVAL [11/2021 - ]
OK
There is no foreign matter on each valve and they operate smoothly.
Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE TRANSMISSION VALVE BODY ASSEMBLY. Refer to COMPONENTS [11/2021 - ]
Result:
OK
See step 6
- Check the transmission valve body assembly.
- INSPECT TORQUE CONVERTER ASSEMBLY
- Check the torque converter assembly.
Refer to INSPECTION [11/2021 - ]
OK
The torque converter operates normally.
Result
Proceed to OK NG
Result:
OK
REPAIR OR REPLACE AUTOMATIC TRANSMISSION ASSEMBLY. Refer to COMPONENTS [11/2021 - ]
Result:
NG
REPLACE TORQUE CONVERTER ASSEMBLY. Refer to COMPONENTS [11/2021 - ]
- Check the torque converter assembly.
- INSPECT SHIFT SOLENOID VALVE SLT
- Remove the shift solenoid valve SLT.
*a Component without harness connected
(Shift Solenoid Valve SLT)Refer to DISASSEMBLY [11/2021 - ]
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition Terminal 1 of the shift solenoid valve SLT - terminal 2 20°C (68°F) 5.0 to 5.6 Ω - Connect a positive (+) lead from the battery with a 21 W bulb to terminal 2 and a negative (-) lead to terminal 1 of the solenoid valve connector. Check that the valve moves and makes an operating sound.
OK
Valve moves and makes an operating sound.
Result
Proceed to OK NG
Result:
OK
See step 5
Result:
NG
REPLACE SHIFT SOLENOID VALVE SLT. Refer to COMPONENTS [11/2021 - ]
- Remove the shift solenoid valve SLT.
- CLEAR DTC AND PERFORM STALL SPEED TEST
- Clear the DTCs.
Powertrain > ECT > Clear DTCs
HINT:
Write down the currently output DTCs before clearing them.
- Perform the stall speed test.
Refer to MECHANICAL SYSTEM TESTS [11/2021 - ]
Result
Result Proceed to Stall speed test can be performed A Stall speed test cannot be performed B
Result:
A
See step 4
Result:
B
See step 7
- Clear the DTCs.
- CLEAR DTC AND PERFORM STALL SPEED TEST
- Clear the DTCs.
Powertrain > ECT > Clear DTCs
HINT:
Write down the currently output DTCs before clearing them.
- Perform the stall speed test.
Refer to MECHANICAL SYSTEM TESTS [11/2021 - ]
Result
Result Proceed to Stall speed test can be performed A Stall speed test cannot be performed B
Result:
B
See step 7
Result:
A
See step 10
- Clear the DTCs.
- CLEAR THE DTC AND RUNNING TEST
- Clear the DTCs.
Powertrain > ECT > Clear DTCs
HINT:
Write down the currently output DTCs before clearing them.
- Start the engine, drive the vehicle and perform the inspection.
Result
Result Proceed to Only DTCs P0796 and P2714 are output A Only DTCs P0796, P2714 and P2808 are output B
Result:
A
See step 4
Result:
B
See step 11
- Clear the DTCs.
- INSPECT SHIFT SOLENOID VALVE SL4
- Remove the shift solenoid valve SL4.
*a Component without harness connected
(Shift Solenoid Valve SL4)Refer to DISASSEMBLY [11/2021 - ]
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition Terminal 1 of the shift solenoid valve SL4 - terminal 2 20°C (68°F) 5.0 to 5.6 Ω - Connect a positive (+) lead from the battery with a 21 W bulb to terminal 2 and a negative (-) lead to terminal 1 of the solenoid valve connector. Check that the valve moves and makes an operating sound.
OK
Valve moves and makes an operating sound.
Result
Proceed to OK NG
Result:
OK
See step 5
Result:
NG
REPLACE SHIFT SOLENOID VALVE SL4. Refer to COMPONENTS [11/2021 - ]
- Remove the shift solenoid valve SL4.