COMPRESSOR AND PULLEY (for 2GR-FSE 2WD): Installation
- ADJUST COMPRESSOR OIL
- When replacing the compressor with a new one, after gradually discharging the refrigerant gas from the service valve, drain the following volume of oil from the new compressor before installation.
Standard:
(Oil capacity inside a new compressor: 130 + 15 cc (4.6 + 0.51 fl.oz.)) - (Remaining oil amount in the removed compressor) = (Oil amount to be removed from the new compressor when replacing.
NOTE:- When checking the compressor oil level, observe the precautions in the cooler removal/installation.
- If a new compressor is installed without removing some oil remaining in the pipes of the vehicle, the oil amount becomes excessive. This prevents heat exchange in the refrigerant cycle and causes refrigerant failure.
- If the volume of oil remaining in the removed compressor and magnetic clutch is too small, check for oil leakage.
- Be sure to use ND-OIL 8 for compressor oil.
- When replacing the compressor with a new one, after gradually discharging the refrigerant gas from the service valve, drain the following volume of oil from the new compressor before installation.
- INSTALL COMPRESSOR ASSEMBLY
- Using an E8 "Torx" socket, install the compressor with the stud bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Install the compressor with the 3 bolts and nut.
Torque: 24.5 N*m (250 kgf*cm, 18 ft.*lbf)
NOTE: Tighten the bolts in the order shown in the illustration to install the compressor.
- Using an E8 "Torx" socket, install the compressor with the stud bolt.
- INSTALL DISCHARGE HOSE SUB-ASSEMBLY
- Remove the attached vinyl tape from the discharge hose.
- Apply sufficient compressor oil (ND-OIL 8) to a new O-ring and the fitting surface of the compressor.
Compressor oil:
ND-OIL 8 or equivalent
- Install the O-ring on the discharge hose.
- Install the discharge hose on the compressor with the bolt.
Torque: 9.8 N*m (100 kgf*cm, 7 in.*lbf)
- INSTALL NO. 1 COOLER REFRIGERANT SUCTION HOSE
- Remove the attached vinyl tape from the suction hose.
- Apply sufficient compressor oil (ND-OIL 8) to a new O-ring and the fitting surface of the compressor.
Compressor oil:
ND-OIL 8 or equivalent
- Install the O-ring on the suction hose.
- Install the suction hose on the compressor with the bolt.
Torque: 9.8 N*m (100 kgf*cm, 7 in.*lbf)
- INSTALL ENGINE UNDER COVER (See INSTALLATION )
- INSTALL FAN AND GENERATOR V BELT (See INSTALLATION )
- INSTALL NO. 1 AIR CLEANER INLET (See INSTALLATION )
- INSTALL ENGINE ROOM LH SIDE COVER (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- CHARGE REFRIGERANT (See REPLACEMENT )
- INSTALL COOL AIR INTAKE DUCT SEAL (See INSTALLATION )
- WARM UP ENGINE (See REPLACEMENT )
- CHECK FOR LEAKAGE OF REFRIGERANT (See REPLACEMENT )
- PERFORM INITIALIZATION
- Perform initialization (See
INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (See
INITIALIZATION
).