Water Pump: Installation
- INSTALL WATER PUMP ASSEMBLY
- Install a new gasket and the water pump with the 16 bolts.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf) for bolt A 9.1 N*m (93 kgf*cm, 81 in*lbf) for bolt B and C
NOTE:- Be sure to replace the 2 bolts labeled C with new ones or reuse them after applying adhesive.
Adhesive:
Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent
- Make sure that there is no oil on the threads of bolt A.
- Be sure to replace the 2 bolts labeled C with new ones or reuse them after applying adhesive.
- Install a new gasket and the water pump with the 16 bolts.
- INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY (See INSTALLATION )
- INSTALL V-RIBBED BELT TENSIONER ASSEMBLY (for 2WD) (See INSTALLATION )
- INSTALL V-RIBBED BELT TENSIONER ASSEMBLY (for 4WD) (See INSTALLATION )
- INSTALL WATER PUMP PULLEY
- Temporarily install the pulley with the 4 bolts.
- Using SST, hold the pulley and tighten the 4 bolts.
SST 09960-10010 (09962-01000, 09963-00700)
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- INSTALL WATER INLET
- Install a new gasket to the water inlet housing.
- Install a new O-ring to the water outlet pipe.
- Install the water inlet with the 4 bolts and nut.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
NOTE: Be careful not to allow the O-ring to get caught between other parts. - Connect the 5 hoses.
- INSTALL COOLER COMPRESSOR ASSEMBLY (for 2WD) (See INSPECTION )
- TEMPORARILY TIGHTEN COOLER COMPRESSOR ASSEMBLY (for 4WD) (See INSTALLATION )
- INSTALL OIL FILTER BRACKET SUB-ASSEMBLY (for 4WD) (See INSTALLATION )
- INSTALL OIL FILTER BRACKET (for 4WD) (See INSTALLATION )
- TIGHTEN COOLER COMPRESSOR ASSEMBLY (for 4WD) (See INSTALLATION )
- INSTALL DISCHARGE HOSE SUB-ASSEMBLY (See INSTALLATION )
- INSTALL NO. 1 COOLER REFRIGERANT SUCTION HOSE (See INSTALLATION )
- INSTALL INJECTOR DRIVER (See INSTALLATION )
- INSTALL NO. 1 ENGINE COVER (See INSTALLATION )
- INSTALL NO. 2 ENGINE COVER
- Install the cover with the 3 nuts.
- Install the engine wire harness cover with the 3 nuts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- INSTALL V-RIBBED BELT (See INSTALLATION )
- CONNECT NO. 2 RADIATOR HOSE
- CONNECT NO. 1 RADIATOR HOSE
- INSTALL NO. 1 AIR CLEANER INLET (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- ADD ENGINE COOLANT (See REPLACEMENT )
- INSPECT FOR ENGINE COOLANT LEAK (See COOLING SYSTEM )
- INSTALL V-BANK COVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL ENGINE ROOM SIDE COVER LH (See INSTALLATION )
- INSTALL COOL AIR INTAKE DUCT SEAL (See INSTALLATION )
- INSTALL REAR ENGINE UNDER COVER LH (for 2WD)
- INSTALL ENGINE UNDER COVER (for 2WD)
- INSTALL ENGINE UNDER COVER (for 4WD)
- PERFORM INITIALIZATION
- Perform initialization (see
INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see
INITIALIZATION
).