Roof Opening Panel Guide Rails (G2299454): Installation
WARNING: This page is about a different car, the 2019 Land Rover Range Rover Velar. However, it is still accessible from the selected car via links, so may be relevant.
-
CAUTION:
- Make sure to protect surrounding trim components from roof blind motor cable debris. Failure to follow this instruction could cause damage to the vehicle.
- Gloves must be worn when handling the roof blind motor cables.
- Make sure the roof panel motor cables are installed.
- Carefully install the roof opening panel guide rail to the correct position.
- Install and tighten the 9 roof opening panel guide rail bolts.
Torque : 3.5 Nm
- Push both of the roof opening panel guide rails all the way backwards to the 'open' position.
- Install the roof opening panel motor.
Refer to: ROOF OPENING PANEL MOTOR
- Connect the startup battery ground cable.
Refer to: STARTUP BATTERY DISCONNECT AND CONNECT
- Install the roof opening panel air deflector.
Refer to: ROOF OPENING PANEL AIR DEFLECTOR
- Install the roof opening panel.
Refer to: ROOF OPENING PANEL GLASS
- Initialize the roof opening panel.
Refer to: MOTOR SYNCHRONIZATION