LEMON Manuals: Even more car manuals for everyone
Home >> Infiniti >> 2017 >> QX70 RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 191 (Hybrid Battery System (Introduction And Diagnostic Trouble Codes (DTCS)) P0A09-P0C6E) (Hybrid)) >> Basic Inspection >> Service After Replacing Li-Ion Battery Parts >> Description

Service After Replacing Li-Ion Battery Parts: Description

WARNING: This page is about a different car, the 2016 Infiniti Q50. However, it is still accessible from the selected car via links, so may be relevant.

The work procedure for replacing Li-ion battery parts depends on parts or part combinations. When replacing Li-ion battery parts, refer to the table below:

: Replacement

Replacement parts Remarks Remarks
LBC One module All modules (12) Battery pack
(Include LBC)
* - - -
  • LBC data must be moved
  • Configuration must be performed
WORK PROCEDURE 
* * - -
  • LBC data must be moved
  • Configuration must be performed
- - * - LBC data must be erased WORK PROCEDURE 
* - * -
  • Unnecessary to move/erase LBC data
  • Configuration must be performed
WORK PROCEDURE 
- * - - Unnecessary to move/erase LBC data WORK PROCEDURE 
- - - *
  • Unnecessary to move/erase LBC data
  • Configuration must be performed
WORK PROCEDURE 
NOTE:
  • There is no change in the work procedure when Li-ion battery parts (e.g. battery junction box and service plug) other than those listed in the above table are replaced simultaneously.
  • To replace Li-ion battery controller (LBC), battery information stored in LBC must be saved in a new LBC.