LEMON Manuals: Even more car manuals for everyone
Home >> Infiniti >> 2017 >> QX70 RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 191 (Hybrid Battery System (Introduction And Diagnostic Trouble Codes (DTCS)) P0A09-P0C6E) (Hybrid)) >> Basic Inspection >> Additional Service When Replacing Module >> Work Procedure

Work Procedure

WARNING: This page is about a different car, the 2016 Infiniti Q50. However, it is still accessible from the selected car via links, so may be relevant.
CAUTION:

When replacing LBC simultaneously, perform the work procedure of Li-ion battery controller replacement. Refer to WORK PROCEDURE .

  1. REMOVAL OF MODULE

    Remove module. Refer to DISASSEMBLY AND ASSEMBLY .

    GO TO STEP 2  .

  2. ADJUSTMENT OF MODULE VOLTAGE

    Adjust the voltage of module requiring replacement. Refer to WORK PROCEDURE .

    GO TO STEP 3  .

  3. INSTALLATION OF MODULE

    Install new module. Refer to DISASSEMBLY AND ASSEMBLY .

    When one module is replaced 

    WORK END

    When all modules are replaced 

    GO TO STEP 4  .

  4. CLEAR LBC INTERNAL INFORMATION

    G-20 With CONSULT

    1. Select "WORK SUPPORT" mode of "HV BAT".
    2. Select "CLEAR BATTERY INFORMATION".
    3. Touch "CLEAR".

    WORK END