Work Procedure
WARNING: This page is about a different car, the 2016 Infiniti Q50. However, it is still accessible from the selected car via links, so may be relevant.
CAUTION:
When replacing LBC simultaneously, perform the work procedure of Li-ion battery controller replacement. Refer to WORK PROCEDURE .
- REMOVAL OF MODULE
Remove module. Refer to DISASSEMBLY AND ASSEMBLY .
GO TO STEP 2 .
- ADJUSTMENT OF MODULE VOLTAGE
Adjust the voltage of module requiring replacement. Refer to WORK PROCEDURE .
GO TO STEP 3 .
- INSTALLATION OF MODULE
Install new module. Refer to DISASSEMBLY AND ASSEMBLY .
When one module is replaced
WORK END
When all modules are replaced
GO TO STEP 4 .
- CLEAR LBC INTERNAL INFORMATION
With CONSULT
- Select "WORK SUPPORT" mode of "HV BAT".
- Select "CLEAR BATTERY INFORMATION".
- Touch "CLEAR".
WORK END