LEMON Manuals: Even more car manuals for everyone
Home >> Dodge and Ram >> 2020 >> Durango R/T, AWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 10 (6.4L Engine (Service Information)) >> Installation

Section 10 (6.4L Engine (Service Information)): Installation

WARNING: This page is about a different variant/trim than selected.
CAUTION:

If the engine encounters a catastrophic failure, the engine oil cooler and lines must be replaced or damage to the new engine or components could result.

GC0080289Courtesy of CHRYSLER GROUP, LLC
NOTE:

Do not use air tools to install Engine Lift Fixture and Adapter (special tool #8984C, Fixture, Engine Lifting) (2, 3).

  1. Install the engine lift fixture (2) (special tool #8984C, Fixture, Engine Lifting) and adapter (special tool #8984-UPD, Adapter, Engine Lift) (4).
  2. Using a suitable engine hoist, lower the engine into the engine compartment.
  3. Automatic transmission equipped vehicles, align the engine with the transmission.
  4. Install two transmission bell housing to engine block bolts finger tight.
  5. Lower the engine assembly until the engine mounts rest in the engine cradle crossmember.
    GC0144614Courtesy of CHRYSLER GROUP, LLC
    NOTE:

    Left side shown, right side similar.

  6. Align the engine mounts, install both left/right engine mount to frame retaining bolts (2) and tighten to the proper specifications. Refer to TORQUE SPECIFICATIONS  .
  7. Position both left and right engine mount heat shields (4), install the retaining nuts (3) and tighten to the proper specifications. Refer to TORQUE SPECIFICATIONS  .
  8. Remove the engine hoist and the jack supporting the transmission.
  9. Raise and support the vehicle.
    GC0080287Courtesy of CHRYSLER GROUP, LLC
  10. Automatic transmission equipped vehicles, install the oil pan to transmission bolts (1) and tighten to the proper specifications. Refer to TORQUE SPECIFICATIONS  .
    GC0080288Courtesy of CHRYSLER GROUP, LLC
  11. Install the remaining transmission bell housing to engine block bolts (2) and tighten to the proper specifications. Refer to TORQUE SPECIFICATIONS  .
    GC0080286Courtesy of CHRYSLER GROUP, LLC
    CAUTION:

    It is essential that the correct length bolts are used to attach the converter to the flexplate. Bolts that are too long will damage the clutch surface inside the torque converter.

  12. Rotate the crankshaft in clockwise direction and install all torque converter to flexplate bolts (1) finger tight.
  13. Verify that the torque converter is pulled flush to the flexplate and tighten bolts to 88 N.m (65 ft. lbs.).
    GC0080285Courtesy of CHRYSLER GROUP, LLC
  14. Install the inspection cover (1) and tighten the retaining bolt (2) to tighten to the proper specifications. Refer to TORQUE SPECIFICATIONS  .
    GC0095565Courtesy of CHRYSLER GROUP, LLC
    NOTE:

    The Crankshaft Position (CKP) sensor is located at the right rear side of the engine block.

  15. Connect the CKP sensor electrical connector (1).
    GC0144624Courtesy of CHRYSLER GROUP, LLC
    NOTE:

    Left side shown, right side similar.

  16. Connect the right and left knock sensor (1) electrical connectors (5).
  17. Install the heat shield onto the right side knock sensor (shield snaps on/off sensor).
  18. Connect the transmission oil cooler lines to their retainers at the oil pan.
  19. Install the starter. Refer to 6.4L
    GC0080046Courtesy of CHRYSLER GROUP, LLC
  20. Position the catalytic converters (4) onto the exhaust manifold flanges, install the flange nuts (3) and tighten to the proper specifications. Refer to TORQUE SPECIFICATIONS
  21. Connect the oxygen sensor electrical connectors (2).
  22. Install the generator

    Refer to 6.4L

  23. Install the A/C compressor. Refer to 5.7L/6.4L ENGINES
    GC0095212Courtesy of CHRYSLER GROUP, LLC
  24. Install the lower radiator hose (1).
  25. Lower the vehicle.
    GC0080289Courtesy of CHRYSLER GROUP, LLC
  26. Remove the engine lift fixture (special tool #8984C, Fixture, Engine Lifting) (2) and adapter (special tool #8984-UPD, Adapter, Engine Lift) (4).
  27. Position the left and right side wiring harness.
    GC0144407Courtesy of CHRYSLER GROUP, LLC
  28. Lubricate the oil control valve (OCV) rubber O-ring seal with clean engine oil.
  29. Install the OCV (3) and rotate into position.
  30. Install the OCV retaining bolt (2) and tighten to 11 N.m (8 ft. lbs.).
  31. Connect the OCV electrical connector (1).
    GC0144611Courtesy of CHRYSLER GROUP, LLC
  32. Position the heater core tube (3) into the water pump.
  33. Install the heater core tube retaining bolt (1) and tighten to the proper specifications. Refer to TORQUE SPECIFICATIONS GAS
  34. Connect the electrical connector to the coolant temperature (ECT) sensor (2).
    GC0148461Courtesy of CHRYSLER GROUP, LLC
  35. Connect the camshaft position sensor electrical connector (1).
    GC0095566Courtesy of CHRYSLER GROUP, LLC
  36. Connect the heater hoses (1, 2).
  37. Connect the ground wires to the rear of each cylinder head.
    GC0080072Courtesy of CHRYSLER GROUP, LLC
    NOTE:

    The ignition capacitor (2) is attached to the rear of the left cylinder head.

  38. Connect the ignition capacitor (2) electrical connector (1).
    GC0080075Courtesy of CHRYSLER GROUP, LLC
  39. Position the ignition coil electrical harness and connect all ignition coil electrical connectors (1).
  40. Install the intake manifold. Refer to MANIFOLD, INTAKE, INSTALLATION .
    GC0095586Courtesy of CHRYSLER GROUP, LLC
  41. Connect the oil pressure sensor electrical connector (1).
  42. Connect the oil temperature sensor electrical connector.
  43. GC0145991Courtesy of CHRYSLER GROUP, LLC
  44. Position the coolant bottle (1) and install the coolant bottle retaining bolts (4). Tighten to the proper specifications. Refer to TORQUE SPECIFICATIONS GAS
  45. Position the wire harness and secure to the right hand inner fender panel.
  46. Install the cooling fan. Refer to FAN, COOLING, INSTALLATION .
    GC0148460Courtesy of CHRYSLER GROUP, LLC
  47. Position the oil cooler hose (4) and Install oil cooler hose clamp (3).
  48. Position the upper radiator hose (2) and Install the upper radiator hose clamp (1).
  49. Install the cowl panel cover. Refer to COVER, COWL PANEL, INSTALLATION .
  50. Fill the crankcase with the specified type and amount of engine oil. Refer to CAPACITIES AND RECOMMENDED FLUIDS, SPECIFICATIONS .
  51. Fill the cooling system with the specified type and amount of engine coolant. Refer to COOLANT SYSTEM AIR EVACUATION
    GC0148445Courtesy of CHRYSLER GROUP, LLC
  52. Install the engine covers (1) onto the ball studs.
  53. Install the air cleaner housing assembly. Refer to BODY, AIR CLEANER, INSTALLATION .
  54. Raise and support the vehicle.
  55. Support the transmission with a suitable jack.
  56. Remove the transmission crossmember assembly.
  57. Install the front drive shaft. Refer to INSTALLATION
  58. Install the crossmember. Refer to CROSSMEMBER, TRANSMISSION, INSTALLATION .
  59. If equipped, Install the transmission skid plate. Refer to INSTALLATION
  60. Connect the negative battery cable.
  61. Fill the cooling system. Refer to COOLANT SYSTEM AIR EVACUATION
  62. Start the engine and inspect for leaks.
NOTE:

The Cam/Crank Variation Relearn procedure must be performed using the scan tool anytime there has been a repair/replacement made to a powertrain system, for example: flywheel, valvetrain, camshaft and/or crankshaft sensors or components.