Right Cylinder Head
WARNING: This page is about a different car, the 2006 Dodge Magnum, 2006 Dodge Charger, and 2006 Chrysler 300. However, it is still accessible from the selected car via links, so may be relevant.
| 1 - REAR TIMING COVER |
| 2 - SPECIAL TOOL MD-998306 |
- Position the camshaft seal into the cylinder head. See Fig 1.
- Using MD-998306 (2) tap the seal into place. See Fig 1.
1 - REAR TIMING COVER 2 - SPECIAL TOOL 6788 3 - CAMSHAFT - Apply light coat of clean engine oil to the camshaft oil seal lip and 6788 Seal Protector Sleeve (2).
- Install oil seal 6788 Seal Protector Sleeve (2) onto the camshaft. See Fig 2.
- Slide the camshaft (3) forward, inserting the seal protector (2) through the camshaft seal until the camshaft (3) seats. See Fig 2.
- Remove Special Tool (2) from the camshaft.
1 - CAMSHAFT THRUST PLATE 2 - BOLT 3 - O-RING - Install the camshaft thrust plate (1) and new seal (3) to the rear of the cylinder head. See Fig 3.
1 - TUBE 2 - EGR VALVE - Install the EGR valve (2). See Fig 4.
1 - LOOSENED ROCKER ASSEMBLY 2 - RIGHT CAMSHAFT TDC - Install camshaft sprocket (2) and tighten the camshaft sprocket bolt to 102 N.m (75 ft.lbs.).
1 - RIGHT CAMSHAFT GEAR ALIGNMENT MARK 7 - LEFT CAMSHAFT GEAR 2 - RIGHT CAMSHAFT GEAR 8 - LEFT CAMSHAFT GEAR ALIGNMENT MARK 3 - CYLINDER HEAD TO INNER TIMING BELT COVER BOLTS - RIGHT 9 - CRANKSHAFT GEAR ALIGNMENT MARK 4 - TIMING BELT 10 - CRANKSHAFT GEAR 5 - WATER PUMP PULLEY 11 - TIMING BELT TENSIONER PULLEY 6 - CYLINDER HEAD TO INNER TIMING BELT COVER BOLTS - LEFT 12 - TIMING BELT TENSIONER - Install the timing belt (4). See Fig 6. (Refer to ENGINE/VALVE TIMING/TIMING BELT/CHAIN AND SPROCKETS - INSTALLATION) .
- Install rocker assembly (1). (Refer to ENGINE/CYLINDER HEAD/ROCKER ARM/ADJUSTER ASSY - INSTALLATION) .
1 - FUEL RAIL 2 - IGNITION COIL 3 - CAPACITOR 4 - ENGINE WIRING HARNESS - Install cylinder head cover. See Fig 7. Refer to appropriate cylinder head cover installation procedure.
1 - DRIVE BELT TENSIONER 2 - POWER STEERING PULLEY 3 - AIR CONDITIONING COMPRESSOR 4 - CRANKSHAFT DAMPER 5 - GENERATOR 6 - DRIVE BELT - Install the front timing belt cover. See Figure. (Refer to ENGINE/VALVE TIMING/TIMING BELT/CHAIN COVER(S) - INSTALLATION) .
- Install the vibration damper (4). (Refer to ENGINE/ENGINE BLOCK/VIBRATION DAMPER - INSTALLATION) .
- Fill cooling system. (Refer to COOLING - STANDARD PROCEDURE) .
- Connect the negative battery cable.