Cable-Temperature Control: Installation
NOTE:
Illustration shown with instrument panel removed for clarity.
- Position the temperature control cable (2) to the left side of the HVAC air distribution housing (3).
- Connect the temperature control cable to the blend door pivot lever (4).
- Install the screw (1) that secures the temperature control cable to the air distribution housing. Tighten the screw to 2 N.m (17 in. lbs.).
- Install the steering column opening cover, (Refer to BODY/INSTRUMENT PANEL/COVER-STEERING COLUMN OPENING - INSTALLATION) .
- Connect the temperature door control cable to the A/C-heater control and install the instrument panel center bezel (Refer to BODY/INSTRUMENT PANEL/BEZEL-CENTER - INSTALLATION) .
- Reconnect the negative battery cable.