Oil Pan: Installation
WARNING: This page is about a different car, the 2005 Dodge Stratus and 2005 Chrysler Sebring. However, it is still accessible from the selected car via links, so may be relevant.
- Clean oil pan and sealing surfaces. Inspect oil pan and timing chain cover gaskets. Replace as necessary.
- Apply an 1/8 inch bead of Mopar® Engine RTV GEN II to the front T-joints (oil pan gasket to timing cover gasket interface) and the rear T-joints (oil pan gasket to crankshaft rear oil seal retainer gasket interface). See Figure.
- Install oil pan gasket to block.NOTE: To prevent oil leaks at oil pan to timing chain cover, the following tightening sequence procedure must be performed.
- Install oil pan and fasteners using the following tightening sequence: See Figure.
- Install oil pan bolts and nuts finger tight only-just tight enough to compress the gasket's rubber seal .
- Install timing chain cover to pan bolts and tighten to 12 N.m (105 in. lbs.).
- Tighten oil pan bolts to 28 N.m (250 in. lbs.).
- Tighten oil pan nuts to 12 N.m (105 in. lbs.).
- Install lower bolt attaching the A/C compressor to oil pan. Tighten bolt to 28 N.m (21 ft. lbs.).
- Install torque converter housing cover.
- Install oil filter and drain plug.
- Install exhaust cross-under pipe (Refer to EXHAUST SYSTEM/CROSS-OVER PIPE - INSTALLATION) .
- Install structural collar. See Figure(Refer to ENGINE/ENGINE BLOCK/STRUCTURAL COVER - INSTALLATION) .
- Lower vehicle.
- Install engine oil dipstick and tube.
- Fill engine crankcase with proper oil to correct level.
- Connect negative battery cable.