LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2001 >> Sebring LX, 2D Convertible >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> 2.7L V6 Engine - VIN U >> Cylinder Head >> Removal & Installation >> Installation

Removal & Installation: Installation

The cylinder head bolts are tightened using a torque plus angle procedure. The bolts must be examined BEFORE reuse. If the threads are necked down the bolts must be replaced.

Fig 1: Checking Cylinder Head Bolts
G00378521Courtesy of CHRYSLER CORP.
CAUTION: When cleaning cylinder head and cylinder block surfaces, DO NOT use a metal scraper because the surfaces could be cut or ground. Use ONLY a wooden or plastic scraper.
  1. Clean sealing surfaces of cylinder head and block. See CLEANING .
  2. Install new head gasket over locating dowels.
  3. Install cylinder head to block, assuring head is properly positioned over locating dowels.
  4. Lubricate bolt threads with clean engine oil and install bolts.
  5. Tighten bolts in sequence, using the following steps and torque values:
    • Step 1: Bolts 1-8 to 48 N.m (35 ft. lbs)
    • Step 2: Bolts 1-8 to 75 N.m (55 ft. lbs)
    • Step 3: Bolts 1-8 to 75 N.m (55 ft. lbs)
    • Step 4: Bolts 1-8 to +90° Turn Do not use a torque wrench for this step.
    • Step 5: Bolts 9-11 to 28 N.m (250 INCH lbs)
    Fig 2: Tightening Cylinder Head Bolts
    G00378522Courtesy of CHRYSLER CORP.
  6. For left cylinder head installation:
    • Install engine oil dipstick tube.
    • Install generator.
  7. For right cylinder head removal:
    • Install cylinder head ground strap
    • Connect EGR valve electrical connector (if equipped).
  8. Install all valve train components and camshafts. Tighten camshaft bearing caps in sequence shown in figure to 12 N.m (105 INCH lbs).
    Fig 3: Tightening Camshaft Bearing Cap Sequence
    G00378523Courtesy of CHRYSLER CORP.
  9. Install primary timing chain, guides and sprockets. See INSTALLATION - TIMING CHAIN .
  10. Install water outlet connector.
  11. Install cylinder head covers. Refer to CYLINDER HEAD COVER - LEFT  and CYLINDER HEAD COVER - RIGHT  .
  12. Install timing chain cover. See INSTALLATION - TIMING CHAIN .
  13. Install crankshaft vibration damper.
  14. Install lower and upper intake manifolds. Refer to INSTALLATION - INTAKE MANIFOLD UPPER REMOVAL - LOWER INTAKE MANIFOLD  .
  15. Install catalytic converter(s).
  16. Install exhaust cross-under pipe.
  17. Install accessory drive belts.
  18. Fill cooling system.
  19. Connect negative cable to remote jumper terminal.