Removal Procedure
WARNING: This page is about a different variant/trim than selected.
- Disconnect the battery negative cable. Refer to Battery Negative Cable Disconnection and Connection .
- Remove the engine sight shield. Refer to Engine Sight Shield Replacement .
- Raise and support the vehicle. Refer to Lifting and Jacking the Vehicle .
- Drain the cooling system. Refer to Cooling System Draining and Filling (GE-47716 Fill) and Cooling System Draining and Filling (Static Fill) .
- Remove the ECM from the battery tray and lay aside. Refer to Engine Control Module Replacement .
- Remove the charge air cooler outlet air hose. Refer to Charge Air Cooler Outlet Air Hose Replacement .
- Remove the vacuum hoses (2) from the vacuum pipe and the wastegate vacuum dose.
- Remove the vacuum hose (3) from the EGR control solenoid valve.
- Remove the vacuum hoses (5) from the EGR vacuum tank.
- Remove the 2 bolts (1) and lay the turbocharger wastegate actuator vacuum control solenoid valves with bracket (9) aside.
- Clip out the wiring harness (6) from the vacuum tank.
- Disconnect the wirings harness plugs (8).
- Remove the EGR control solenoid valve bolts (4).
- Remove the EGR vacuum regulator valve solenoid and the bracket (7) from the vacuum tank.
- Remove the oil level indicator dip stick.
- Remove the upper oil level indicator tube bolt (2).
- Remove the oil level indicator tube - upper (1) from the oil level indicator tube - lower (4) and DISCARD the seal ring (3).
- Loosen the vacuum tank bolts (3, 4, 5).
- Loosen the vacuum tank bolts (1, 2).
- Remove the 5 bolts (4) from the EGR vacuum valve body (1).
- Remove the EGR valve tank (5) and the EGR heat exchanger (3).
- Remove and DISCARD the EGR seals (2, 6).