LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2013 >> Cruze LT, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 200 (Engine Mechanical - 1.4L (LDD, LDU, LUH, Or LUJ) - Repair Instructions - Off Vehicle (2 Of 2)) >> Turbocharger Installation >> Special Tool

Special Tool

WARNING: This page is about a different car, the 2011 Chevrolet Cruze. However, it is still accessible from the selected car via links, so may be relevant.

EN-49942:  Holding Wrench

For equivalent regional tools, refer to Special Tools .

  1. Clean the sealing surfaces.
  2. Replace the connect fittings on the turbocharger coolant feed pipe and the turbocharger coolant return pipe. Refer to Turbocharger Disassemble  and Turbocharger Assemble .
  3. Fig 1: Turbocharger Assembly And Turbocharger Gasket
    GM2190430Courtesy of GENERAL MOTORS CORP.
    NOTE: Mind the turbocharger oil return pipe.
  4. Install the turbocharger assembly (1) and a NEW turbocharger gasket (2).
  5. Fig 2: Turbocharger Oil Return Pipe
    GM2190427Courtesy of GENERAL MOTORS CORP.
  6. Connect the turbocharger oil return pipe to the engine while installing the turbocharger.
  7. Install the turbocharger coolant feed pipe hollow screw along with 2 NEW seal rings (1) and (2).
  8. Fig 3: Turbocharger Nuts
    GM2192236Courtesy of GENERAL MOTORS CORP.
    NOTE: Never re-use the turbocharger nuts.
  9. Install the 8 NEW turbocharger nuts (1).
  10. Fig 4: Turbocharger Nuts Tightening Sequence
    GM2192286Courtesy of GENERAL MOTORS CORP.
    CAUTION: Refer to Fastener Caution .
  11. Tighten the 8 turbocharger nuts in a sequence as shown to 8 N.m (71 lb in).
  12. Repeat the tightening procedure to ensure a proper fastening of the turbocharger nuts.
  13. Fig 5: Turbocharger Oil Feed Pipe
    GM2190428Courtesy of GENERAL MOTORS CORP.
  14. Connect the turbocharger coolant return hose (6) to the oil cooler coolant inlet pipe and install the turbocharger coolant return pipe bolt (7) to the oil cooler. Tighten the turbocharger coolant return pipe bolt to 8 N.m (71 lb in).
  15. Install the turbocharger oil feed pipe (2) along with a NEW rubber seal ring.
  16. Install the turbocharger oil feed pipe hollow screw (4) in compound with 2 NEW seal rings (1) and (3).
  17. Install the turbocharger oil feed pipe bolt (5) to the oil cooler and tighten to 10 N.m (89 lb in).
  18. Tighten the turbocharger oil feed pipe hollow screw to 30 N.m (22 lb ft).
  19. Fig 6: Holding Wrench And Ratchet Wrench
    GM2192012Courtesy of GENERAL MOTORS CORP.
    NOTE: The EN-49942:  holding wrench (2) should be installed to turbocharger coolant feed pipe as shown. The holding wrench should be installed to avoid twisting of the turbocharger coolant feed pipe during the fastening procedure.
  20. Install the EN-49942:  holding wrench (2) to the turbocharger coolant feed pipe. Guide a ratchet wrench (1) along with an extension through EN-49942:  holding wrench to the turbocharger coolant feed pipe hollow screw.
  21. Fig 7: Holding Wrench And Extension
    GM2192009Courtesy of GENERAL MOTORS CORP.
    NOTE: EN-49942:  holding wrench (2) should be installed to turbocharger coolant feed pipe as shown. The holding wrench should be installed to avoid twist of the turbocharger coolant feed pipe while the fastening procedure.
  22. Tighten the turbocharger coolant feed pipe hollow screw with ratchet wrench and extension (1) to 30 N.m (22 lb ft).