Install all roller cam followers
NOTE:
The description is provided only at one component. The procedure is the same for all other components.
- If a new hydraulic valve clearance compensating element has not been installed, install in the same position.
- Install all hydraulic valve clearance compensating elements (1) downward.
- If the roller cam followers are not being replaced, install the roller cam followers in the same position.
- Install the roller cam follower (2) .
Follow-up work
- Refer to INSTALLING CYLINDER BANK 2 EXHAUST CAMSHAFT .
- Refer to CHECKING THE INTERMEDIATE LEVER CLASSIFICATION .
- Refer to INSTALLING INTAKE CAMSHAFT OF CYLINDER BANK 2 .
- Refer to INSTALLING THE SLIDING BLOCK OF CYLINDER BANK 2 .
- Refer to INSTALLING TORSION SPRINGS .
- Refer to REMOVING CYLINDER HEAD OF BANK 2 FROM ASSEMBLY JIG .
- Refer to INSTALLING THE LEFT VALVETRONIC SERVOMOTOR (CYLINDER HEAD REMOVED) .
- Refer to INSTALLING THE LEFT INTAKE PLENUM (CYLINDER HEAD REMOVED) .
- Refer to INSTALLING THE LEFT CYLINDER HEAD .
- Refer to INSTALLING BOTH LEFT VANOS ADJUSTERS .
- Refer to REMOVING SPECIAL TOOL TO PRETENSION TIMING CHAIN ON CYLINDER BANK 2 .
- Refer to INSTALLING THE HYDRAULIC CHAIN TENSIONER OF CYLINDER BANK 2 .
- Refer to INSTALLING THE TIMING CASE COVER ON THE CYLINDER HEAD OF CYLINDER BANK 2 .
- Refer to INSTALLING THE LEFT CYLINDER HEAD COVER .
- Refer to INSTALLING THE PRESSURE LINE BETWEEN THE EVAPORATOR AND AIR CONDITIONING CONDENSER .
- Refer to INSTALLING OIL FEED LINE ON EXHAUST TURBOCHARGER CYLINDERS 5 TO 8 .
- Refer to INSTALLING VANOS SOLENOID ACTUATOR, INTAKE OF CYLINDER BANK 2 .
- Refer to INSTALLING THE VANOS SOLENOID ACTUATOR EXHAUST OF CYLINDER BANK 2 .
- Refer to INSTALLING THE LEFT HIGH PRESSURE PUMP .
- Refer to INSTALLING FUEL DELIVERY LINE .
- Refer to INSTALLING THE INJECTORS FOR THE CYLINDERS 5 TO 8 .
- Refer to INSTALLING THE HIGH-PRESSURE RAIL ON THE LEFT .
- Refer to INSTALLING THE IGNITION COILS OF CYLINDER BANK 2 .
- Refer to INSTALLING THE IGNITION COILS OF CYLINDERS 1 AND 5 .
- Refer to INSERTING THE EXHAUST TURBOCHARGER FOR THE CYLINDERS 5 TO 8 .
- Refer to INSTALLING THE CLEAN AIR PIPE OF CYLINDER BANK 2 .
- Refer to INSTALLING CLEAN AIR PIPE OF CYLINDER BANK 1 .
- Refer to INSTALLING BOTH CHARGE AIR COOLERS .
- Refer to CONNECTING THE RIGHT CHARGE AIR LINE TO THE EXHAUST TURBOCHARGER .
- Refer to CONNECTING THE LEFT CHARGE AIR LINE TO THE EXHAUST TURBOCHARGER .
- Refer to CLOSING THE HIGH-TEMPERATURE COOLANT CIRCUIT .
- Refer to INSTALLING THE COOLANT EXPANSION TANK FOR THE LOW-TEMPERATURE COOLANT CIRCUIT (CHARGE AIR COOLER) .
- Refer to SEALING OFF COOLANT FOR LOW-TEMPERATURE COOLANT CIRCUIT .
- Refer to INSTALLING COOLANT PUMPS .
- Refer to INSTALLING THE UNDERBODY PROTECTION OF THE STEERING GEAR OR THE FRONT THRUST FIELD .
- Refer to INSTALLING FRONT UNDERBODY PROTECTION .
- Refer to INSTALLING THE BOTTOM FRONT RIGHT SIDE COVER .
- Refer to INSTALLING DRIVE BELT .
- Refer to INSTALLING FAN COWL .
- Refer to INSTALLING THE REAR TOP CROSS CONNECTION .
- Refer to INSTALLING UPPER CROSS CONNECTION .
- Refer to INSTALLING BOTH FRONT-END STRUTS .
- Refer to INSTALLING THE CENTER ENGINE COMPARTMENT COVER .
- Refer to INSTALLING THE CATALYTIC CONVERTER FOR CYLINDERS 5 TO 8 .
- Refer to RELEASING THE HEAT SHIELD .
- Refer to INSTALLING THE CENTER COWL UPPER PART .
- Refer to INSTALLING TENSION STRUT ON SHOCK TOWER .
- Refer to ATTACHING WINDSHIELD PANEL COVER .
- Refer to INSTALLING LEFT AND RIGHT WIPER ARM .
- Refer to INSTALLING THE REAR RIGHT ENGINE COMPARTMENT COVER .
- Refer to INSTALLING THE COVER OF THE ENGINE COMPARTMENT ON THE REAR LEFT .
- Refer to INSTALLING RIGHT HEAT SHIELD .
- Refer to INSTALLING LEFT HEAT SHIELD .
- Refer to INSTALLING HEAT SHIELD, TOP .
- Refer to INSTALLING THE RIGHT OXYGEN SENSOR MONITOR .
- Refer to INSTALLING THE LEFT OXYGEN SENSOR MONITOR .
- Refer to PARTIALLY INSTALLING THE RIGHT LAMBDA OXYGEN SENSOR .
- Refer to PARTIALLY INSTALLING THE LEFT LAMBDA OXYGEN SENSOR .
- Refer to INSTALLING THE RETAINING BRIDGE IN VEHICLES WITH A GASOLINE PARTICULATE FILTER .
- Refer to INSTALLING THE RETAINING BRIDGE .
- Refer to INSTALLING EXHAUST SYSTEM .
- Refer to INSTALLING CENTER STIFFENING PLATE .
- Refer to INSTALLING TANK COVER ON LEFT AND RIGHT .
- Refer to INSTALLING REAR BUMPER PANEL .
- Refer to INSTALLING THE CONTROL UNIT BRACKET FOR CYLINDERS 5 TO 8 .
- Refer to INSTALLING THE COVER OF THE LEFT DME CONTROL UNIT .
- Refer to INSTALLING CONTROL UNIT HOLDER FOR CYLINDERS 1 TO 4 .
- Refer to INSTALLING THE COVER OF THE RIGHT DME CONTROL UNIT .
- Refer to CONNECTING ALL BATTERY GROUND LEADS .
- Refer to FILLING AND VENTING THE LOW-TEMPERATURE COOLANT CIRCUIT .
- Refer to FILLING AND VENTING THE HIGH-TEMPERATURE COOLANT CIRCUIT .
- Refer to INSTALLING BOTH EXHAUST COVERS .
- Refer to INSTALLING THE REAR BUMPER TRIM .
- Refer to INSTALLING THE REAR DIFFUSER .
- Refer to INSTALLING THE TAIL LIGHT ON THE LEFT AND RIGHT SIDE PANELS .
- Refer to INSTALLING COVER FOR WATER CHANNEL ON LEFT AND RIGHT .
- Refer to INSTALLING THE LUGGAGE COMPARTMENT WHEEL ARCH TRIM PANEL ON THE LEFT AND RIGHT (PARTIALLY REMOVED) .
- Refer to INSTALLING LOADING EDGE TRIM .
- Refer to INSTALLING LUGGAGE COMPARTMENT FLOOR COVERING .
- Refer to CONNECTING ALL BATTERY GROUND LEADS .
- Refer to FILLING AND VENTING THE LOW-TEMPERATURE COOLANT CIRCUIT .
- Refer to FILLING AND VENTING THE HIGH-TEMPERATURE COOLANT CIRCUIT .
- Refer to EVACUATING AND CHARGING CONDITIONING .