Install the transfer box (ATC 13-1)
- Position the transfer box (VTG) with the front prop shaft and hand-tighten it.NOTE: TECHNICAL INFORMATION
When assembling, it is essential to observe screwing sequences and tightening torques.
Failure to comply with the regulations can lead to leaks and damage. - Tighten screws in the order (1) to (5).TIGHTENING TORQUES SPECIFICATION
Transfer box to automatic transmission M10 tightening torque 43 Nm - Connect the connector (1) on the VTG control unit (longitudinal torque distribution) (2).
- Install the ground strap (2).
- Tighten down screw (1).TIGHTENING TORQUES SPECIFICATION
Ground strap to transmission or body M8 tightening torque 19 Nm
Follow-up work
- Refer to INSTALLING FRONT PROPELLER SHAFT AT THE FRONT AXLE TRANSMISSION .
- Refer to INSTALLING TRANSMISSION CROSS MEMBER .
- Refer to IF INSTALLED: SCREWING DOWN TRANSMISSION SUPPORT BRACKET .
- Refer to FASTENING THE PROP SHAFT (PARTIALLY REMOVED) .
- Refer to INSTALLING THE RETAINING PLATES .
- Refer to INSTALLING THE HEAT SHIELDS .
- Refer to INSTALLING THE COMPLETE EXHAUST SYSTEM .
- Refer to INSTALLING THE REAR DIFFUSER .
- Refer to IF INSTALLED: INSTALLING THE REAR AXLE COVER .
- Refer to INSTALLING THE UNDERBODY PLANKING OF THE TRANSMISSION ON THE SIDE .
- Refer to CONNECTING ALL BATTERY GROUND LEADS .
- Refer to CHECKING/TOPPING UP THE TRANSFER BOX OIL (ACTIVE TORQUE CONTROL 13-1) .
- Refer to INSTALLING CENTER STIFFENING PLATE .
- Refer to INSTALLING THE STIFFENING PLATE .
- Refer to INSTALLING TANK COVER ON LEFT AND RIGHT .
- Refer to INSTALLING UNDERBODY PROTECTION AT REAR .