Removing and installing radiator (S55 engine)
WARNING:
Risk of scalding!
Only perform this repair work after engine has cooled down.
IMPORTANT:
Wear safety goggles and protective gloves.
Necessary preliminary tasks:
- Follow notes for CARRYING OUT REPAIR WORK ON THE COOLING SYSTEM .
- Remove FAN COWL .
- Remove FRONT PANEL, CENTER .
- Drain COOLANT .
Removal:
Unlock coolant hoses (1) from right radiator (2) and pull off.
Unlock coolant hoses (1) from left radiator (2) and pull off.
Release screws (1).
Remove cover (2) from the radiator.
Carefully feed out radiator upwards and remove.
Installation:
Carefully feed in radiator downwards and install.
Remove cover (2) from radiator.
Tighten down screws (1).
Tightening torque 17 10 2AZ .
Connect coolant hoses (1) to left radiator (2) and lock.
Coolant hoses (1) must audibly engage.
Connect coolant hoses (1) to right radiator (2) and lock.
Coolant hoses (1) must audibly engage.
Required follow-up work:
- Install FAN COWL .
- Install FRONT PANEL, CENTER .
- Bleed and fill COOLING SYSTEM (HIGH-TEMPERATURE COOLING CIRCUIT) with vacuum filling unit.