32 41 431 Removing and installing/renewing Dynamic Drive expandable hose part 2 (in front wheel arch) (AWD)
WARNING: This page is about a different variant/trim than selected.
Special tools required:
WARNING:
DANGER OF POISONING
if oil is ingested/absorbed through the skin!
DANGER OF INJURY if oil comes into contact with eyes and skin!
DANGER OF INJURY if oil comes into contact with eyes and skin!
IMPORTANT:
Adhere to the utmost cleanliness. Do not allow any dirt to enter the hydraulic system.
Do not draw off hydraulic fluid (risk of contamination).
Close off line connections with seal plug. 32 1 270
Do not draw off hydraulic fluid (risk of contamination).
Close off line connections with seal plug. 32 1 270
Recycling:
Catch and dispose of hydraulic fluid in a suitable collecting vessel.
Necessary preliminary tasks:
- Remove underbody protection
- Remove REINFORCEMENT PLATE
- Remove FRONT RIGHT WHEEL ARCH COVER REAR SECTION
- Partially remove right UNDERBODY PANELLING
IMPORTANT:
Pressure line and connection on valve block must be fitted with suitable seal plugs immediately after removal!
Release screw (1) for pressure line on valve block.
Tightening torque 37 13 3AZ .
Release screws (1), take off heat shield and release line clip (2) from front axle support.
Tightening torque 37 13 9AZ .
Undo screws (1) from line flange and pull off expandable hose.
Tightening torque 37 13 8AZ .
Remove expansion hose
IMPORTANT:
When assembling, make sure that in succession only the seal plugs of the line to be fitted are removed.
When fitting lines, do not tilt connectors (sealing rings!) and connect fully before screwing.
Do not replace sealing rings on hydraulic lines.
Replace affected line if sealing ring is damaged.
When fitting lines, do not tilt connectors (sealing rings!) and connect fully before screwing.
Do not replace sealing rings on hydraulic lines.
Replace affected line if sealing ring is damaged.
After installation:
- Fill and bleed HYDRAULIC SYSTEM
- Check line connections for tightness
- Carry out INITIAL DYNAMIC DRIVE OPERATION