Install the engine cooling fan (FC): Notes
Remove shroud ( 9995474 ) from radiator.
Lift out the engine cooling fan (FC) with the cover. Connect the connector, clamp the wiring.
Install the upper charge air pipe, between charge air cooler and turbocharger (TC).
Install the fresh air intake.
Install the upper fan shroud. Tighten the fan shroud to the radiator (ensure that the clip is in place.
Connect the pressure pipe (to the turbo instruments).
USA: Connect the vacuum hoses to the EGR-regulator.
Install the EVAP canister shut-off valve in the bracket and connect the canister vacuum hose.
Install:
- the air duct for cooling the control module box.
- both relays on the fan shroud and connect connectors. Clamp the wiring
- idle air trim
Install:
- cable to the PTC-element and heated oxygen sensor (HO2S)
Car with manual transmission:
- back-up (reversing) light switch cable
- the gear selector cables rubber mounting.
- gear selector cables to their mounting on the transmission.NOTE: Color marking mounting/cable.
Cars with automatic transmission:
Connect connector to the transmission.
Install gear selector cable (as marked earlier)
Install two transmission oil cooler hoses and negative lead to the transmission.