Installing Hoses
- Position the refrigerant pipe against the firewall
- Position the front section.
NOTE:
Use new O-rings lubricated with compressor oil.
- Carry out other work in reverse order.
- Vacuum pump the system and leak test. See Refrigerant, Draining
- Fill the system with refrigerant and check for leaks. See Refrigerant, Draining
- Connect the battery negative lead. See Battery, Replacing
Tighten to:
Tighten the hose/pipe coupling to the junction point on the side member. Tighten to 25 Nm .
Tighten the pipe coupling to the receiver. Tighten to 10 Nm .
Tighten the pipe coupling to the expansion valve. Tighten to 10 Nm .
Tighten the mounting for the pipe between the expansion valve and the side member. Tighten to 25 Nm .
Tighten the protective cap for the filling valve. Tighten to 6 Nm .