Coolant Pump, Removing And Installing: Installing
WARNING: This page is about a different variant/trim than selected.
Install in reverse order of removal and note the following:
NOTE:
Replace the O-rings after removing them.
-- Clean and smooth the sealing surfaces of the O-rings.
-- Coat the new O-rings with coolant.
-- Install the toothed belt (adjust valve timing). Refer to TOOTHED BELT, REMOVING AND INSTALLING .
-- Fill with coolant. Refer to COOLANT, FILLING .