LEMON Manuals: Even more car manuals for everyone
Home >> Volkswagen >> 2015 >> Jetta S, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 213 (Engine Cooling System (General & Service Information - CZCA, CZDA, CZTA)) >> 19 Cooling System >> Coolant Pump/Coolant Thermostat >> Coolant Pump, Removing And Installing >> Installing

Coolant Pump, Removing And Installing: Installing

WARNING: This page is about a different car, the 2018 Volkswagen Jetta, 2017 Volkswagen Jetta, and 2016 Volkswagen Jetta. However, it is still accessible from the selected car via links, so may be relevant.

-- Replace the housing seal -arrows-.

-- Replace the toothed belt as well if the coolant pump is being replaced.

-- Make sure the seals fit correctly -arrows-.

GWWN19-10767Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

-- Coat the seal on the coolant pump with coolant.

NOTE:

Perform the following procedure for installing the coolant pump exactly in the sequence given.

This will assure the toothed belt is tensioned correctly.

A second technician is needed for the following procedure.

-- Turn cylinder 1 to TDC. Refer to VALVE TIMING, CHECKING .

-- Lay the toothed belt in the center and move the coolant pump into its installed position.

-- Position the coolant pump and bolts on the cylinder head.

-- Tighten the bolts in the specified sequence: 

GWWA19-11550Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.
Step Component Tightening Specification
1 Bolts -1 to 5- Install by hand all the way
2 Bolts -1 to 5- 10 Nm

-- Loosen all the bolts one turn.

-- Position the :VAS6583  with a 10 mm inner hex socket -6- on the coolant pump.

GWWN19-10783Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

-- Pretension the coolant pump on the inner hex socket clockwise to 30 Nm using a 10 mm socket -6-, extension and :VAS6583  .

-- For better operation, mount the : VAS6583  vertically.

-- Hold the coolant pump under pretension.

-- While doing so, have a second technician pre-tighten the coolant pump bolts clockwise beginning with bolt -2, 1 and 5- >>step 3<<.

-- Then tighten the bolts in >>step 4<<.

Step Component Tightening Specification
3 Bolts -2, 1 and 5- 10 Nm
4 Bolts -3, 4, 5, 1 and 2- 12 Nm

Further installation is performed in reverse order of removal, while noting the following:

Coolant hose connection diagram. Refer to CONNECTION DIAGRAM - COOLANT HOSES .

-- Fill with coolant. Refer to Filling .