Turbocharger with attachments: Notes
WARNING: This page is about a different variant/trim than selected.
Observe safety precautions. Refer to Safety precautions .
Observe rules for cleanliness. Refer to Rules for cleanliness .
NOTE:
- Hose connections are secured by clamps and retaining clips.
- The spring-type clip pliers VAS 5024A are recommended for installing spring-type clips.
- Do not install hose connections with lubricants containing oil.
- Charge air system must be properly sealed.
- Before screwing on oil supply line, fill turbocharger with engine oil at filler tube.
- After installing turbocharger, let engine run at idle for approx. 1 minute and without increasing engine speed. This ensures that charger is lubricated.
- Replace self-locking nuts.