Removal [12/2022 - ]: Procedure
- REMOVE NO. 1 ENGINE UNDER COVER ASSEMBLY
Refer to PROCEDURE - Step 2 [12/2022 - 03/2023] , or refer to PROCEDURE - Step 2 [03/2023 - ]
- REMOVE REAR ENGINE UNDER COVER RH
Refer to PROCEDURE - Step 3 [12/2022 - 03/2023] , or refer to PROCEDURE - Step 3 [03/2023 - ]
- REMOVE OIL PRESSURE CONTROL VALVE ASSEMBLY
- Disconnect the oil pressure control valve assembly connector.
- Using an 8 mm socket wrench, remove the bolt and oil pressure control valve assembly from the No. 2 timing chain cover assembly.NOTE:
If the oil pressure control valve assembly is dropped or subjected to a strong impact, replace it with a new one.