Installation [02/2024 - ]: Procedure
- INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY
*a Protrusion - - - Install a new throttle body gasket to the intake manifold with the protrusion of the throttle body gasket oriented as shown in the illustration.
- Install the throttle body with motor assembly to the intake manifold.NOTE:
If the throttle body with motor assembly has been struck or dropped, replace it.
- INSTALL NO. 2 AIR TUBE
*a Protrusion - - - Install a new throttle body gasket to the No. 2 air tube with the protrusion of the throttle body gasket oriented as shown in the illustration.
- Install the No. 2 air tube to the throttle body with motor assembly and intake manifold with the 4 bolts.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- INSTALL AIR TUBE SUPPORT
Torque: 21 N.m (214 kgf/cm, 15 ft.lbf)
- INSTALL INTAKE MANIFOLD STAY
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- INSTALL NO. 1 TURBO PRESSURE SENSOR NOTE:
If the No. 1 turbo pressure sensor has been struck or dropped, replace it.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- INSTALL NO. 1 INTAKE MANIFOLD TO HEAD GASKET
- INSTALL INTAKE MANIFOLD
-
Bolt A Bolt B Nut - - - Temporarily install the intake manifold and fuel delivery guard with 4 bolts and 2 nuts.
- Tighten the 4 bolts and 2 nuts in the order shown in the illustration.
for bolt A
Torque: 24 N.m (245 kgf/cm, 18 ft.lbf)
for bolt B
Torque: 21 N.m (214 kgf/cm, 15 ft.lbf)
- Install the air tube support to the engine assembly with the bolt.
Torque: 21 N.m (214 kgf/cm, 15 ft.lbf)
-
- CONNECT NO. 5 WATER BY-PASS HOSE
- CONNECT NO. 4 WATER BY-PASS HOSE
- INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
- INSTALL NO. 1 WATER HOSE CLAMP BRACKET
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- CONNECT WATER BY-PASS HOSE ASSEMBLY WITH NO. 2 WATER BY-PASS HOSE
- CONNECT FUEL TUBE SUB-ASSEMBLY
- INSTALL VACUUM SWITCHING VALVE BRACKET
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- INSTALL NO. 1 FUEL VAPOR FEED HOSE
- INSTALL PURGE VSV (DUTY VACUUM SWITCHING VALVE)
Refer to PROCEDURE - Step 1 - CONNECT ENGINE WIRE
- INSTALL NO. 2 AIR HOSE
*a Retainer - - - Connect the No. 2 air hose to the intercooler assembly and lock the 2 retainers as shown in the illustration.NOTE:
Securely insert the retainer so that the 4 locks are engaged. Then, pull and check that the locks are engaged and that the hose cannot be pulled out.
HINT:
- Install so that the protrusion on the intercooler assembly and the stoppers are aligned.
- Make sure that the retainer end contacts the stopper as shown in the illustration.
*a Correct *b Incorrect *c Retainer End *d Stopper *e Protrusion
- Connect the No. 2 air hose to the intercooler assembly and lock the 2 retainers as shown in the illustration.
- CONNECT RADIATOR HOSE SUB-ASSEMBLY
*a Paint Mark *b Upper Side of Vehicle *c Right Side of Vehicle *d Front Side of Vehicle *e 120° - - - Connect the radiator hose sub-assembly to the intercooler assembly, engine assembly and slide the hose clamp to secure the hose.NOTE:
Make sure to position the clip as shown in the illustration.
- Install the radiator hose sub-assembly to the intake manifold with the 2 bolts.
Torque: 5.0 N.m (51 kgf/cm, 44 in.lbf)
- Connect the radiator hose sub-assembly to the intercooler assembly, engine assembly and slide the hose clamp to secure the hose.
- ADD ENGINE COOLANT
Refer to PROCEDURE - Step 4
- INSPECT FOR COOLANT LEAK
Refer to PROCEDURE - Step 1
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL
HINT:
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.