LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2022 >> Avalon XLE >> Repair and Diagnosis >> External Pages >> Different car >> Section 26 (Exhaust / Intake System (Service Information) [A25A-FKS]) >> Exhaust Manifold >> Installation [08/2020 - ] >> Procedure

Installation [08/2020 - ]: Procedure

WARNING: This page is about a different car, the 2021 Toyota Avalon. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR 
    1. Install the No. 2 exhaust manifold heat insulator to the exhaust manifold (TWC: Front Catalyst) with the 6 bolts.

      Torque: 11 N*m (112 kgf*cm, 8 ft.*lbf) 

  2. INSTALL EXHAUST MANIFOLD (TWC: Front Catalyst) 
    1. Install a new exhaust manifold to head gasket to the cylinder head sub-assembly.
    2. Temporarily install the exhaust manifold (TWC: Front Catalyst), No. 1 upper front floor heat insulator and No. 1 exhaust manifold heat insulator.

      HINT: 

      At this time, do not install the parts with bolts or nuts.

    3. Fig 1: Nut Tightening Sequence
      GTY764362Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Temporarily install the exhaust manifold (TWC: Front Catalyst) to the cylinder head sub-assembly with 7 new nuts.

    4. Using a 12 mm deep socket wrench, tighten the 7 nuts in the order shown in the illustration.

      Torque: 26 N*m (265 kgf*cm, 19 ft.*lbf) 

  3. INSTALL MANIFOLD STAY 
    1. Temporarily install the manifold stay to the exhaust manifold (TWC: Front Catalyst) and cylinder block sub-assembly with the bolt and nut.
      Fig 2: Bolt and Nut Tightening Sequence
      GTY745060Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Tighten the bolt and nut in the order shown in the illustration.

      Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf) 

  4. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR 
    1. Using a 10 mm union nut wrench, install the No. 1 exhaust manifold heat insulator to the exhaust manifold (TWC: Front Catalyst) with the 5 bolts.

      Specified tightening torque 

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

      HINT: 

      • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

        Refer to PRECAUTION [04/2018 - ]

      • When using a 10 mm union nut wrench (fulcrum length of 22 mm (0.866 in.)) + torque wrench (fulcrum length of 162 mm (6.38 in.)): 8.8 N*m (90 kgf*cm, 78 in.*lbf)
      GTY768861Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Torque Wrench Fulcrum Length
  5. INSTALL NO. 1 UPPER FRONT FLOOR HEAT INSULATOR 
    1. GTY947576Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Torque Wrench Fulcrum Length

      Using a 10 mm union nut wrench, install the No. 1 upper front floor heat insulator to the vehicle body with the 3 nuts.

      Specified tightening torque 

      Torque: 4.9 N*m (50 kgf*cm, 43 in.*lbf) 

      HINT: 

      • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

        Refer to PRECAUTION [04/2018 - ]

      • When using a 10 mm union nut wrench (fulcrum length of 22 mm (0.866 in.)) + torque wrench (fulcrum length of 162 mm (6.38 in.)): 4.3 N*m (44 kgf*cm, 38 in.*lbf)
  6. INSTALL WIRE HARNESS CLAMP BRACKET 
    1. Install the wire harness clamp bracket with the bolt.

      Torque: 13 N*m (133 kgf*cm, 10 ft.*lbf) 

  7. INSTALL AIR FUEL RATIO SENSOR (for Sensor 1) 

    Refer to INSTALLATION [08/2020 - ]

  8. INSTALL FRONT CENTER UPPER SUSPENSION BRACE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 5 [08/2020 - 08/2021] , or refer to PROCEDURE - Step 5 [08/2021 -]

  9. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 3

  10. INSTALL FRONT LOWER NO. 1 FLOOR HEAT INSULATOR 

    Refer to PROCEDURE - Step 4

  11. INSTALL PROPELLER WITH CENTER BEARING SHAFT ASSEMBLY 

    Refer to INSTALLATION [08/2020 - ]

  12. INSTALL FRONT EXHAUST PIPE ASSEMBLY (TWC: Rear Catalyst) 
    1. Install 2 new gaskets to the front exhaust pipe assembly (TWC: Rear Catalyst).
    2. Connect the front exhaust pipe assembly (TWC: Rear Catalyst) to the 2 exhaust pipe supports.
    3. Install the front exhaust pipe assembly (TWC: Rear Catalyst) to the exhaust manifold (TWC: Front Catalyst) and center exhaust pipe assembly with 2 new bolts and 2 new nuts.

      Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf) 

    4. Connect the air fuel ratio sensor (for sensor 2) connector.
    5. Engage the 2 wire harness clamps.
  13. INSTALL CENTER FLOOR CROSSMEMBER BRACE 

    See step  6

  14. INSTALL FRONT CENTER FLOOR BRACE 

    See step  7

  15. INSTALL FRONT FLOOR COVER LH 

    See step  8

  16. INSTALL FRONT FLOOR COVER RH 

    See step  9

  17. INSPECT FOR EXHAUST GAS LEAK 

    See step  10

  18. INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY 

    Refer to PROCEDURE - Step 70

  19. INSTALL NO. 1 ENGINE UNDER COVER 

    Refer to PROCEDURE - Step 71

  20. INSTALL FRONT WHEEL OPENING EXTENSION PAD LH 

    Refer to PROCEDURE - Step 72

  21. INSTALL FRONT WHEEL OPENING EXTENSION PAD RH 

    Refer to PROCEDURE - Step 73