LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2021 >> Mirai XLE >> Repair and Diagnosis >> Hybrid/Electric Powertrain >> Electric Motor Systems >> Hybrid Battery Control System - Service Information (5 Of 6) >> 2nd ELECTRIC VEHICLE CONVERTER COOLING BLOWER >> Installation [11/2021 - ] >> Procedure

Installation [11/2021 - ]: Procedure

  1. INSTALL DC/DC CONVERTER COOLING BLOWER ASSEMBLY 
    1. GTY1167334Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Claw Remove in this Direction
      1. When replacing with a new part:

        Pull the wire harness in the direction shown in the illustration and remove the wire harness from the claw.

      2. Install the DC/DC converter cooling blower assembly to the converter cooling blower bracket with the 3 nuts.

        Torque: 7.5 N.m (76 kgf/cm, 66 in.lbf) 

      3. Engage the 2 clamps.
  2. INSTALL DC/DC CONVERTER COOLING BLOWER ASSEMBLY WITH CONVERTER COOLING BLOWER BRACKET 
    GTY993405Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    WARNING:

    Wear insulated gloves.

    Torque: 7.5 N.m (76 kgf/cm, 66 in.lbf) 

  3. INSTALL DC/DC CONVERTER COOLING EXHAUST DUCT 
    GTY993405Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    Refer to PROCEDURE - Step 1
  4. INSTALL LUGGAGE COMPARTMENT TRIM COVER INNER RH 
  5. INSTALL LUGGAGE COMPARTMENT TRIM COVER INNER LH 
  6. INSTALL REAR FLOOR FINISH PLATE 
  7. INSTALL FRONT LUGGAGE COMPARTMENT TRIM COVER 
  8. INSTALL TOOL BOX 
  9. INSTALL LUGGAGE COMPARTMENT TRIM COVER LH 
  10. INSTALL LUGGAGE COMPARTMENT MAT SUB-ASSEMBLY 
  11. CONNECT FC CONVERTER POWER OUTLET CABLE (INVERTER WITH CONVERTER ASSEMBLY) 
    GTY993405Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    Refer to PROCEDURE - Step 58 [11/2021 - 12/2023] , or refer to PROCEDURE - Step 58 [12/2023 - ]
  12. INSTALL FC STACK COVER SUB-ASSEMBLY 
  13. INSTALL UPPER RADIATOR SUPPORT SEAL 
  14. INSTALL SERVICE PLUG GRIP 

    Refer to INSTALLATION [11/2020 - 12/2022] , or refer to INSTALLATION [12/2022 - ]