LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2021 >> Camry LE, FWD >> Repair and Diagnosis >> Engine Mechanical >> Lubrication System >> Engine Lubrication System (A25A-FKS) - Service Information (Except Hybrid) >> Oil Pressure Sensor >> Installation [03/2017 - 09/2019] >> Procedure

Installation [03/2017 - 09/2019]: Procedure

  1. INSTALL OIL PRESSURE SENSOR (OIL PRESSURE SENDER GAUGE ASSEMBLY) 
    1. Apply adhesive to 2 or 3 threads of the oil pressure sensor (oil pressure sender gauge assembly).

      Adhesive

      Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent

      GTY769164Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Adhesive 1344
      *b Oil Inlet Port
      NOTE:
      • Do not apply adhesive to the oil inlet port of the oil pressure sensor (oil pressure sender gauge assembly).
      • Install the oil pressure sensor (oil pressure sender gauge assembly) within 3 minutes of applying adhesive.
    2. Using a 27 mm deep socket wrench, install the oil pressure sensor (oil pressure sender gauge assembly) to the cylinder block sub-assembly.

      Torque: 15 N*m (153 kgf*cm, 11 ft.*lbf) 

    3. Connect the oil pressure sensor (oil pressure sender gauge assembly) connector.
  2. INSPECT FOR ENGINE OIL LEAK 

    Refer to PROCEDURE - Step 6 [03/2017 - 06/2017] , or refer to PROCEDURE - Step 6 [06/2017 - 09/2019]

  3. INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY 

    Refer to PROCEDURE - Step 67 [03/2017 - 06/2017] , or refer to PROCEDURE - Step 67 [06/2017 - 08/2018] , or refer to PROCEDURE - Step 67 [08/2018 - 03/2020]

  4. INSTALL NO. 1 ENGINE UNDER COVER 

    Refer to PROCEDURE - Step 68 [03/2017 - 06/2017] , or refer to PROCEDURE - Step 68 [06/2017 - 08/2018] , or refer to PROCEDURE - Step 68 [08/2018 - 03/2020]

  5. INSTALL FRONT WHEEL OPENING EXTENSION PAD LH 

    Refer to PROCEDURE - Step 69 [03/2017 - 06/2017] , or refer to PROCEDURE - Step 69 [06/2017 - 08/2018] , or refer to PROCEDURE - Step 69 [08/2018 - 03/2020]

  6. INSTALL FRONT WHEEL OPENING EXTENSION PAD RH 

    Refer to PROCEDURE - Step 70 [03/2017 - 06/2017] , or refer to PROCEDURE - Step 70 [06/2017 - 08/2018] , or refer to PROCEDURE - Step 70 [08/2018 - 03/2020]