Installation [08/2020 - ]: Procedure
- INSTALL COMBINATION METER ASSEMBLY
- INSTALL NO. 2 INSTRUMENT PANEL GARNISH SUB-ASSEMBLY
Refer to PROCEDURE - Step 12 [08/2020 - 12/2021] , or refer to PROCEDURE - Step 12 [12/2021 - ]
- INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY
Refer to PROCEDURE - Step 13 [08/2020 - 12/2021] , or refer to PROCEDURE - Step 13 [12/2021 - ]
- INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH ASSEMBLY
Refer to PROCEDURE - Step 12
- INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
Refer to PROCEDURE - Step 14 [08/2020 - 12/2021] , or refer to PROCEDURE - Step 14 [12/2021 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to PROCEDURE - Step 2
- INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL
HINT:
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.