LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2021 >> C-HR LE >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter / Gauge / Display - Service Information >> Combination Meter >> Installation [02/2017 - 08/2020] >> Procedure

Installation [02/2017 - 08/2020]: Procedure

  1. INSTALL COMBINATION METER ASSEMBLY 
    1. Connect the 2 connectors to install the combination meter assembly.
    2. Engage the guides and clips.
      GTY744485Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Install the 2 screws.
  2. INSTALL NO. 2 INSTRUMENT PANEL GARNISH SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 15 [02/2017 - 10/2017] , or refer to PROCEDURE - Step 16 [10/2017 - 12/2017] , or refer to PROCEDURE - Step 16 [12/2017 - 05/2018] , or refer to PROCEDURE - Step 18 [05/2018 - 09/2019] , or refer to PROCEDURE - Step 12 [09/2019 - 08/2020]

  3. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY 

    Refer to PROCEDURE - Step 16 [02/2017 - 10/2017] , or refer to PROCEDURE - Step 17 [10/2017 - 12/2017] , or refer to PROCEDURE - Step 17 [12/2017 - 05/2018] , or refer to PROCEDURE - Step 19 [05/2018 - 09/2019] , or refer to PROCEDURE - Step 13 [09/2019 - 08/2020]

  4. INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH ASSEMBLY 

    Refer to PROCEDURE - Step 11 [02/2017 - 10/2017] , or refer to PROCEDURE - Step 11 [10/2017 - 09/2019] , or refer to PROCEDURE - Step 12 [09/2019 - ]

  5. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 17 [02/2017 - 10/2017] , or refer to PROCEDURE - Step 18 [10/2017 - 12/2017] , or refer to PROCEDURE - Step 18 [12/2017 - 05/2018] , or refer to PROCEDURE - Step 20 [05/2018 - 09/2019] , or refer to PROCEDURE - Step 14 [09/2019 - 08/2020]

  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Refer to PROCEDURE - Step 2

    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Refer to INITIALIZATION [02/2017 - 10/2017] , or refer to INITIALIZATION [10/2017 - 05/2018] , or refer to INITIALIZATION [05/2018 - 09/2019] , or refer to INITIALIZATION [09/2019 - 08/2020]