Installation [08/2015 - 08/2019]: Procedure
- INSTALL NO. 2 TELEPHONE BRACKET
- Install the bracket with the 2 bolts.
- INSTALL NO. 1 TELEPHONE BRACKET
- Install the bracket with the 3 bolts.
- Connect the 2 connectors.
- INSTALL MAYDAY BATTERY WITH BRACKET
- Attach the 2 claws to install the mayday battery.
- Install the bracket with the bolt.
Torque: 13 N*m (133 kgf*cm, 10 ft.*lbf)
- INSTALL DCM (TELEMATICS TRANSCEIVER)
- INSTALL LOWER INSTRUMENT PANEL SUB-ASSEMBLY
Refer to PROCEDURE - Step 14
- INSTALL INSTRUMENT PANEL BOX DOOR COVER
Refer to PROCEDURE - Step 15
- INSTALL LOWER NO. 2 INSTRUMENT PANEL AIRBAG ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL LOWER INSTRUMENT COVER LH
Refer to PROCEDURE - Step 17
- INSTALL FRONT NO. 2 CONSOLE BOX INSERT
Refer to PROCEDURE - Step 7
- INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 18
- INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH
Refer to PROCEDURE - Step 3
- INSTALL COWL SIDE TRIM BOARD RH
Refer to PROCEDURE - Step 32
- INSTALL DOOR SCUFF PLATE ASSEMBLY RH
Refer to PROCEDURE - Step 78
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Refer to INITIALIZATION [08/2015 - 08/2019] ).
- CHECK SRS WARNING LIGHT
- Check the SRS warning light (Refer to PROCEDURE - Step 6 ).
- PERFORM REGISTRATION
- Perform registration (Refer to DCM ACTIVATION [08/2015 - 08/2019]
).NOTE:
When replacing the mayday battery or DCM (telematics transceiver) (together with the mayday battery), perform registration.
- Perform registration (Refer to DCM ACTIVATION [08/2015 - 08/2019]
).