LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2020 >> RAV4 XLE, AWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 124 (Engine Lubrication System (A25A-FXS) - Service Information) >> Engine Oil Cooler >> Installation [11/2018 - ] >> Procedure

Installation [11/2018 - ]: Procedure

WARNING: This page is about a different variant/trim than selected.
  1. INSTALL OIL COOLER ASSEMBLY 
    1. Install a new oil control valve filter to the cylinder block sub-assembly.
    2. Install 2 new oil cooler gaskets to the oil cooler assembly.
    3. Install the oil cooler assembly to the cylinder block sub-assembly with the 4 bolts.

      Torque: 16 N.m (163 kgf/cm, 12 ft.lbf) 

    4. Connect the No. 1 water by-pass hose and No. 2 water by-pass hose to the oil cooler assembly, and slide the 2 clips to secure them.
  2. ADD ENGINE OIL 

    Refer to PROCEDURE - Step 5 [11/2018 - 02/2019] , or refer to PROCEDURE - Step 5 [02/2019 - 08/2020] , or refer to PROCEDURE - Step 5 [08/2020 - 12/2021] , or refer to PROCEDURE - Step 5 [12/2021 - 10/2023] , or refer to PROCEDURE - Step 5 [10/2023 - ]

  3. ADD ENGINE COOLANT (for Engine) 

    Refer to PROCEDURE - Step 2 [11/2018 - 02/2019] , or refer to PROCEDURE - Step 2 [02/2019 - 12/2021] , or refer to PROCEDURE - Step 2 [12/2021 - ]

  4. CHECK ENGINE OIL LEVEL 

    Refer to PROCEDURE - Step 1 [11/2018 - 02/2019] , or refer to PROCEDURE - Step 1 [02/2019 - 08/2020] , or refer to PROCEDURE - Step 1 [08/2020 - 10/2023] , or refer to PROCEDURE - Step 1 [10/2023 - ]

  5. INSPECT FOR OIL LEAK 

    Refer to PROCEDURE - Step 6 [11/2018 - 02/2019] , or refer to PROCEDURE - Step 6 [02/2019 - 08/2020] , or refer to PROCEDURE - Step 6 [08/2020 - 12/2021] , or refer to PROCEDURE - Step 6 [12/2021 - 10/2023] , or refer to PROCEDURE - Step 6 [10/2023 - ]

  6. INSPECT FOR COOLANT LEAK (for Engine) 

    Refer to PROCEDURE - Step 3 [11/2018 - 02/2019] , or refer to PROCEDURE - Step 3 [02/2019 - ]

  7. INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY 

    Refer to PROCEDURE - Step 65 [11/2018 - 02/2019] , or refer to PROCEDURE - Step 65 [02/2019 - 08/2020] , or refer to PROCEDURE - Step 65 [08/2020 - 12/2021] , or refer to PROCEDURE - Step 65 [12/2021 - ]

  8. INSTALL NO. 1 ENGINE UNDER COVER 

    Refer to PROCEDURE - Step 66 [11/2018 - 02/2019] , or refer to PROCEDURE - Step 66 [02/2019 - 08/2020] , or refer to PROCEDURE - Step 66 [08/2020 - 12/2021] , or refer to PROCEDURE - Step 66 [12/2021 - ]

  9. INSTALL FRONT FENDER FRONT SPLASH SHIELD RH 

    Refer to PROCEDURE - Step 68 [11/2018 - 02/2019] , or refer to PROCEDURE - Step 68 [02/2019 - 08/2020] , or refer to PROCEDURE - Step 68 [08/2020 - 12/2021] , or refer to PROCEDURE - Step 68 [12/2021 - ]

  10. INSTALL FRONT FENDER FRONT SPLASH SHIELD LH 

    Refer to PROCEDURE - Step 67 [11/2018 - 02/2019] , or refer to PROCEDURE - Step 67 [02/2019 - 08/2020] , or refer to PROCEDURE - Step 67 [08/2020 - 12/2021] , or refer to PROCEDURE - Step 67 [12/2021 - ]