Installation [12/2015 - 08/2016]: Procedure
WARNING: This page is about a different car, the 2016 Toyota Sienna. However, it is still accessible from the selected car via links, so may be relevant.
- INSTALL PURGE VSV
- Install the purge VSV with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the fuel vapor feed hose assembly and No. 1 fuel vapor feed hose.
- Connect the wire harness clamp.
- Connect the purge VSV connector.
- Install the purge VSV with the bolt.
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 95