Installation [11/2018 - ]: Procedure
- INSTALL FUEL PUMP CONTROL ECU
- Install the fuel pump control ECU bracket to the fuel pump control ECU with the 2 bolts.
Torque: 4.5 N.m (46 kgf/cm, 40 in.lbf)
- Install the fuel pump control ECU to the body with the 2 bolts.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- Connect the 2 connectors to the fuel pump control ECU.
- Install the fuel pump control ECU bracket to the fuel pump control ECU with the 2 bolts.
- INSTALL DECK TRIM SIDE PANEL ASSEMBLY LH
Refer to INSTALLATION [11/2018 - 02/2019] , or refer to INSTALLATION [02/2019 - 08/2020] , or refer to INSTALLATION [08/2020 - 10/2023] , or refer to INSTALLATION [10/2023 - ]
- CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [11/2018 - 02/2019] , or refer to INITIALIZATION [02/2019 - 10/2019] , or refer to INITIALIZATION [10/2019 - 06/2020] , or refer to INITIALIZATION [06/2020 - 08/2020] , or refer to INITIALIZATION [08/2020 - 12/2021] , or refer to INITIALIZATION [12/2021 - 10/2022] , or refer to INITIALIZATION [10/2022 - 10/2023] , or refer to INITIALIZATION [10/2023 - ]
- INSTALL BATTERY HOLE COVER
Refer to PROCEDURE - Step 3 [11/2018 - 08/2020] , or refer to PROCEDURE - Step 3 [08/2020 - ]
- INSTALL REAR NO. 2 FLOOR BOARD
Refer to PROCEDURE - Step 4 [11/2018 - 08/2020] , or refer to PROCEDURE - Step 4 [08/2020 - ]
- INSTALL DECK BOARD ASSEMBLY
Refer to PROCEDURE - Step 5 [11/2018 - 08/2020] , or refer to PROCEDURE - Step 5 [08/2020 - ]