LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2018 >> Camry LE >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 8 (Engine Control System (2GR-FKS) - Service Information (Except Hybrid)) >> ACTIVE CONTROL ENGINE MOUNT (for Front Side) >> Installation [06/2017 - ] >> Procedure

Installation [06/2017 - ]: Procedure

WARNING: This page is about a different variant/trim than selected.
  1. INSTALL FRONT ENGINE MOUNTING INSULATOR 
    1. Install the stay to the front engine mounting insulator with the nut.

      Torque: 6.0 N*m (61 kgf*cm, 53 in.*lbf) 

    2. Install the front engine mounting insulator to the front frame assembly with the 3 nuts.

      Torque: 72 N*m (734 kgf*cm, 53 ft.*lbf) 

    3. Install the front engine mounting bracket to the transaxle housing with the 3 bolts.

      Bolt (A), (B) and (C) 

      Torque: 42 N*m (428 kgf*cm, 31 ft.*lbf) 

      NOTE:

      Temporarily tighten the bolt (A), and then fully tighten the 3 bolts in the order of (B), (C) and (A).

      GTY748684Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Install the front engine mounting bracket to the front engine mounting insulator with the bolt.

      Bolt (D) 

      Torque: 72 N*m (734 kgf*cm, 53 ft.*lbf) 

    5. Connect the vacuum hose to the front engine mounting insulator.
    6. Engage the 2 clamps to install the vacuum hoses to the front engine mounting insulator.
  2. INSTALL REAR ENGINE UNDER COVER LH 

    Refer to PROCEDURE - Step 68 [06/2017 - 10/2020] , or refer to PROCEDURE - Step 68 [10/2020 - ]

  3. INSTALL NO. 1 ENGINE UNDER COVER 

    Refer to PROCEDURE - Step 69 [06/2017 - 10/2020] , or refer to PROCEDURE - Step 69 [10/2020 - ]

  4. INSTALL FRONT WHEEL OPENING EXTENSION PAD LH 

    Refer to PROCEDURE - Step 70 [06/2017 - 10/2020] , or refer to PROCEDURE - Step 70 [10/2020 - ]

  5. INSTALL FRONT WHEEL OPENING EXTENSION PAD RH 

    Refer to PROCEDURE - Step 71 [06/2017 - 10/2020] , or refer to PROCEDURE - Step 71 [10/2020 - ]

  6. INSTALL V-BANK COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 46 [06/2017 - 10/2020] , or refer to PROCEDURE - Step 46 [10/2020 - ]

  7. INSTALL VACUUM SWITCHING VALVE (for Active Control Engine Mount System) 

    Refer to INSTALLATION [06/2017 - ]