Removal [11/2015 - ]: Procedure
- REMOVE UPPER INSTRUMENT PANEL ASSEMBLY
(Refer to REMOVAL [11/2015 - 06/2017] and Refer to REMOVAL [06/2017 - ] )
- REMOVE NO. 1 SWITCH HOLE BASE
Refer to PROCEDURE - Step 3 and Refer to PROCEDURE - Step 3
- REMOVE LIGHT CONTROL RHEOSTAT