LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2009 >> Matrix XRS, Automatic >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 6 (Engine Mechanical (2ZR-FE)) >> Cylinder Head Gasket >> Installation

Cylinder Head Gasket: Installation

WARNING: This page is about a different variant/trim than selected.
  1. INSTALL CYLINDER HEAD GASKET 
    1. Place a new gasket on the cylinder block surface with the Lot No. stamp facing upward.
    NOTE:
    • Remove any oil from the contact surface.
    • Make sure that the gasket is installed in the correct direction.
    Fig 1: Identifying Cylinder Head Gasket
    G06008730Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL CYLINDER HEAD SUB-ASSEMBLY 

    HINT:

    The cylinder head bolts are tightened in 2 progressive steps.

    1. Apply a light coat of engine oil to the bolt threads and the area beneath the bolt heads that come in contact with the washers.
    2. Install the bolts and plate washers to the cylinder head.
      NOTE: Do not drop the washers into the cylinder head.
    3. Using several steps, uniformly install and tighten the 10 cylinder head bolts and 10 plate washers with a 10 mm bi-hexagon wrench in the order shown in the illustration.

      Torque: 49 N*m (500 kgf*cm, 36 ft.*lbf) 

      Fig 2: Identifying Cylinder Head Bolt Tighten Sequence
      G05398915Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Mark the front side of the cylinder head bolts with paint.
    5. Retighten the cylinder head bolts an additional 90°, then once more 45° as shown in the illustration.
    6. Check that the paint mark is now at a 135° angle to the front.
      Fig 3: Identifying Cylinder Head Bolts Tighten Angle
      G05398916Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. INSTALL VALVE LASH ADJUSTER ASSEMBLY  (See REASSEMBLY )
  4. INSTALL NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY  (See REASSEMBLY )
  5. INSTALL NO. 1 CAMSHAFT BEARING  (See INSTALLATION )
  6. INSTALL NO. 2 CAMSHAFT BEARING  (See INSTALLATION )
  7. INSTALL NO. 2 CAMSHAFT  (See INSTALLATION )
  8. INSTALL CAMSHAFT  (See INSTALLATION )
  9. INSTALL CAMSHAFT BEARING CAP  (See INSTALLATION )
  10. INSTALL CAMSHAFT HOUSING SUB-ASSEMBLY  (See INSTALLATION )
  11. INSTALL CAMSHAFT TIMING GEAR ASSEMBLY  (See INSTALLATION )
  12. INSTALL CAMSHAFT TIMING EXHAUST GEAR ASSEMBLY  (See INSTALLATION )
  13. INSTALL NO. 1 CHAIN VIBRATION DAMPER 
    1. Install the No. 1 chain vibration damper with the 2 bolts.

      Torque: 21 N*m (214 kgf*cm, 16 ft.*lbf) 

      Fig 4: Locating No. 1 Chain Vibration Damper Bolts
      G05399333Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  14. INSTALL NO. 2 CHAIN VIBRATION DAMPER  (See INSTALLATION )
  15. INSTALL CHAIN SUB-ASSEMBLY 
    1. Check the No. 1 cylinder TDC/compression.
      1. Temporarily tighten the crankshaft pulley bolt.
      2. Turn the crankshaft counterclockwise to position the timing gear key to the top.
      3. Remove the crankshaft pulley bolt.
        Fig 5: Identifying Timing Gear Key
        G05399334Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      4. Check the timing marks on each camshaft timing gear.
      Fig 6: Identifying Timing Marks On Camshaft Timing Gear
      G05399335Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Align the mark plate (orange) with the timing mark of the No. 2 camshaft as shown in the illustration and install the chain.

      HINT:

      • Be sure to position the mark plate at the front of the engine.
      • The mark plate on the camshaft side is colored orange.
      • Do not pass the chain around the sprocket of the camshaft timing gear assembly. Only place it on the sprocket.
      • Pass the chain through the No. 1 vibration damper.
      Fig 7: Identifying Timing Mark Of No. 2 Camshaft
      G05399336Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Place the chain on the crankshaft without passing it around the shaft.
      Fig 8: Identifying Chain On Crankshaft
      G05399337Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Hold the hexagonal portion of the camshaft with a wrench and turn the camshaft timing gear assembly counterclockwise to align the mark plate (orange) and timing mark.

      HINT:

      • Be sure to position the mark plate at the front of the engine.
      • The mark plate on the camshaft side is colored orange.
    5. Hold the hexagonal portion of the camshaft with a wrench and turn the camshaft timing gear assembly clockwise.

      HINT:

      To tension the chain, slowly turn the camshaft timing gear assembly clockwise to prevent the chain from being misaligned.

      Fig 9: Holding Hexagonal Portion Of Camshaft
      G06008738Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    6. Align the mark plate (yellow) and timing mark and install the chain to the crankshaft timing gear.

      HINT:

      The mark plate on the crankshaft side is colored yellow.

    7. Recheck each timing mark at TDC/compression.
    Fig 10: Identifying Timing Mark On Crankshaft Timing Gear
    G05399339Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    Fig 11: Identifying Crankshaft Timing Mark Location
    G05399340Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  16. INSTALL CHAIN TENSIONER SLIPPER 
    1. Install the chain tensioner slipper.
      Fig 12: Identifying Chain Tensioner Slipper
      G05399222Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  17. INSTALL TIMING CHAIN COVER OIL SEAL  (See REASSEMBLY )
  18. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY  (See INSTALLATION )
  19. INSTALL CRANKSHAFT PULLEY  (See INSTALLATION )
  20. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY  (See REASSEMBLY )
  21. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY  (See REASSEMBLY )
  22. INSTALL RADIO SETTING CONDENSER  (See INSTALLATION )
  23. INSTALL THERMOSTAT  (See INSTALLATION )
  24. INSTALL WATER INLET  (See INSTALLATION )
  25. INSTALL WATER INLET HOSE  (See INSTALLATION )
  26. INSTALL WATER BY-PASS HOSE  (See INSTALLATION )
  27. INSTALL NO. 1 WATER BY-PASS PIPE  (See INSTALLATION )
  28. CONNECT NO. 3 WATER BY-PASS HOSE  (See INSTALLATION )
  29. INSTALL VENTILATION HOSE  (See INSTALLATION )
  30. INSPECT EXHAUST MANIFOLD  (See INSPECTION )
  31. INSTALL EXHAUST MANIFOLD  (See INSTALLATION )
  32. INSTALL MANIFOLD STAY  (See INSTALLATION )
  33. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR  (See INSTALLATION )
  34. INSTALL OIL LEVEL DIPSTICK SUB-ASSEMBLY  (See INSTALLATION )
  35. INSTALL IGNITION COIL ASSEMBLY  (See INSTALLATION )
  36. INSTALL FUEL INJECTOR ASSEMBLY  (See INSTALLATION )
  37. INSTALL NO. 1 DELIVERY PIPE SPACER  (See INSTALLATION )
  38. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY  (See INSTALLATION )
  39. INSTALL FUEL TUBE SUB-ASSEMBLY  (See INSTALLATION )
  40. INSTALL INTAKE MANIFOLD  (See INSTALLATION )
  41. REMOVE ENGINE STAND  (See INSTALLATION )
  42. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE 

    HINT:

    See INSTALLATION .