Engine Unit: Installation
- INSTALL ENGINE COOLANT TEMPERATURE SENSOR
- Using a 19 mm deep socket wrench, install the engine coolant temperature sensor and a new gasket.
Torque: 20 N*m (200 kgf*cm, 14 ft.*lbf)
- Using a 19 mm deep socket wrench, install the engine coolant temperature sensor and a new gasket.
- INSTALL KNOCK CONTROL SENSOR (See INSPECTION )
- INSTALL KNOCK CONTROL SENSOR WIRE
- Connect the 2 knock control sensor connectors and 3 clamps.
- INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY
- Clean the threads of the oil pressure switch. Apply adhesive to 2 or 3 threads of the oil pressure switch assembly.
Adhesive:
Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent
- Using a 24 mm deep socket wrench, install the oil pressure switch.
Torque: 15 N*m (153 kgf*cm, 11 ft.*lbf)
NOTE: Do not start the engine within 1 hour after installation to prevent oil leaks.
- Clean the threads of the oil pressure switch. Apply adhesive to 2 or 3 threads of the oil pressure switch assembly.
- INSTALL NO. 1 VACUUM SWITCHING VALVE
- Install the bolt and No. 1 vacuum switching valve.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Install the bolt and No. 1 vacuum switching valve.
- INSTALL RADIO SETTING CONDENSER
- Install the 2 bolts and 2 radio setting condensers.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Install the 2 bolts and 2 radio setting condensers.
- INSTALL WATER PUMP PULLEY (See INSTALLATION )
- INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY
- Install the idler pulley cover plate, No. 2 idler pulley sub-assembly and No. 2 idler pulley cover plate with the bolt.
Torque: 54 N*m (550 kgf*cm, 40 ft.*lbf)
HINT:
Plate diameter:
Idler pulley cover plate: 33.6 mm (1.32 in.)
No. 2 idler pulley cover plate: 37.8 mm (1.49 in.)
- Install the idler pulley cover plate, No. 2 idler pulley sub-assembly and No. 2 idler pulley cover plate with the bolt.
- INSTALL NO. 2 TIMING GEAR COVER
- Install the No. 2 timing gear cover with the 2 bolts.
Torque: 6.0 N*m (61 kgf*cm, 53 in.*lbf)
- Install the No. 2 timing gear cover with the 2 bolts.
- INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
- Temporarily install the V-ribbed belt tensioner assembly with the 5 bolts.
HINT:
Each bolt length is as follows:
A: 70 mm (2.76 in.)
B: 33 mm (1.30 in.)
- Install the V-ribbed belt tensioner assembly by tightening the bolt 1 and bolt 2 in the order shown in the illustration.
Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf)
- Tighten the other bolts.
Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf)
- Temporarily install the V-ribbed belt tensioner assembly with the 5 bolts.
- INSTALL GENERATOR ASSEMBLY (See INSTALLATION )
- INSTALL TRANSVERSE ENGINE MOUNTING BRACKET (for 4WD)
- Install the transverse engine mounting bracket with the 3 bolts.
Torque: 64 N*m (650 kgf*cm, 47 ft.*lbf)
- Install the transverse engine mounting bracket with the 3 bolts.
- INSTALL TRANSVERSE ENGINE MOUNTING BRACKET (for 2WD)
- Install the transverse engine mounting bracket with the 3 bolts.
Torque: 64 N*m (650 kgf*cm, 47 ft.*lbf)
- Install the transverse engine mounting bracket with the 3 bolts.
- INSTALL TRANSVERSE ENGINE MOUNTING BRACKET
- Install the transverse engine mounting bracket with the 3 bolts.
Torque: 54 N*m (551 kgf*cm, 40 ft.*lbf)
- Install the transverse engine mounting bracket with the 3 bolts.
- INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH
- Install a new gasket as shown in the illustration.
- Install the exhaust manifold sub-assembly LH with the 6 nuts in the order shown in the illustration.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR
- Install the No. 2 exhaust manifold heat insulator with the 3 bolts.
Torque: 8.5 N*m (87 kgf*cm, 75 in.*lbf)
- Install the No. 2 exhaust manifold heat insulator with the 3 bolts.
- INSTALL NO. 2 MANIFOLD STAY
- Install the No. 2 manifold stay with the bolt and nut in the order shown in the illustration.
Torque: 34 N*m (347 kgf*cm, 25 ft.*lbf)
- Install the No. 2 manifold stay with the bolt and nut in the order shown in the illustration.
- INSTALL NO. 2 ENGINE OIL LEVEL DIPSTICK GUIDE
- Install a new O-ring to the No. 2 engine oil level dipstick guide.
- Apply a light coat of engine oil to the O-rings.
- Push in the No. 2 engine oil level dipstick guide end into the No. 1 engine oil level dipstick guide.
- Install the No. 2 engine oil level dipstick guide with the bolt.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- Install the engine oil level dipstick.
- INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH
- Install a new gasket as shown in the illustration.
- Install the exhaust manifold sub-assembly RH with the 6 nuts in the order shown in the illustration.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- INSTALL INTAKE MANIFOLD NOTE: DO NOT apply oil to the bolts listed below:TIGHTENING PART SPECIFICATION
Tightening Parts Intake Manifold and Cylinder Head Sub-assembly RH Intake Manifold and Cylinder Head Sub-assembly LH Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
- Set a new gasket on each cylinder head.NOTE:
- Align the port holes of the gasket and cylinder head.
- Make sure that the gasket is installed in the correct direction.
- Set the intake manifold on the cylinder heads.
- Install and tighten the 6 bolts and 4 nuts uniformly in several steps.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- Set a new gasket on each cylinder head.
- INSTALL NO. 2 ENGINE MOUNTING STAY RH
- Install the No. 2 mounting stay RH with the bolt.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- Install the No. 2 mounting stay RH with the bolt.
- INSTALL IGNITION COIL ASSEMBLY (See INSTALLATION )
- INSTALL ENGINE HANGERS
- Install the 2 engine hangers with the 4 bolts as shown in the illustration.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Part No.:
No. 1 Engine hanger 12281-31120
No. 2 Engine hanger 12282-31100
Bolts 91671-10825
Torque: 33 N*m (337 kgf*cm, 24 ft.*lbf)
- Attach the engine sling device and hang the engine with the chain block.
- Install the 2 engine hangers with the 4 bolts as shown in the illustration.
- REMOVE ENGINE STAND