LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2009 >> Highlander Limited, FWD >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> Engine Mechanical (2GR-FE) >> Engine Unit >> Installation

Engine Unit: Installation

  1. INSTALL ENGINE COOLANT TEMPERATURE SENSOR 
    1. Using a 19 mm deep socket wrench, install the engine coolant temperature sensor and a new gasket.

      Torque: 20 N*m (200 kgf*cm, 14 ft.*lbf) 

  2. INSTALL KNOCK CONTROL SENSOR  (See INSPECTION )
    Fig 1: Identifying EFI Engine Coolant Temperature Sensor
    G04974495Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. INSTALL KNOCK CONTROL SENSOR WIRE 
    1. Connect the 2 knock control sensor connectors and 3 clamps.
      Fig 2: Locating Knock Control Sensor Connectors And Clamps
      G06112742Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  4. INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY 
    1. Clean the threads of the oil pressure switch. Apply adhesive to 2 or 3 threads of the oil pressure switch assembly.

      Adhesive: 

      Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent 

      Fig 3: Cleaning Threads Of Oil Pressure Switch
      G04974196Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Using a 24 mm deep socket wrench, install the oil pressure switch.

      Torque: 15 N*m (153 kgf*cm, 11 ft.*lbf) 

      NOTE: Do not start the engine within 1 hour after installation to prevent oil leaks.
      Fig 4: Removing Engine Oil Pressure Switch Assembly
      G05136532Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  5. INSTALL NO. 1 VACUUM SWITCHING VALVE 
    1. Install the bolt and No. 1 vacuum switching valve.

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

      Fig 5: Removing Bolt And No. 1 Vacuum Switching Valve
      G04974493Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  6. INSTALL RADIO SETTING CONDENSER 
    1. Install the 2 bolts and 2 radio setting condensers.

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

  7. INSTALL WATER PUMP PULLEY  (See INSTALLATION )
    Fig 6: Removing Bolts And Radio Setting Condensers
    G04974492Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  8. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY 
    1. Install the idler pulley cover plate, No. 2 idler pulley sub-assembly and No. 2 idler pulley cover plate with the bolt.

      Torque: 54 N*m (550 kgf*cm, 40 ft.*lbf) 

      HINT:

      Plate diameter:

      Idler pulley cover plate: 33.6 mm (1.32 in.)

      No. 2 idler pulley cover plate: 37.8 mm (1.49 in.)

      Fig 7: Identifying No. 2 Idler Pulley Cover Plate And No. 2 Idler Pulley Sub-Assembly
      G06112738Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  9. INSTALL NO. 2 TIMING GEAR COVER 
    1. Install the No. 2 timing gear cover with the 2 bolts.

      Torque: 6.0 N*m (61 kgf*cm, 53 in.*lbf) 

      Fig 8: Removing Bolts And No. 2 Timing Gear Cover
      G04974489Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  10. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY 
    1. Temporarily install the V-ribbed belt tensioner assembly with the 5 bolts.

      HINT:

      Each bolt length is as follows:

      A: 70 mm (2.76 in.)

      B: 33 mm (1.30 in.)

    2. Install the V-ribbed belt tensioner assembly by tightening the bolt 1 and bolt 2 in the order shown in the illustration.

      Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf) 

      Fig 9: Identifying V-Ribbed Belt Tensioner
      G04974508Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Tighten the other bolts.

      Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf) 

  11. INSTALL GENERATOR ASSEMBLY  (See INSTALLATION )
  12. INSTALL TRANSVERSE ENGINE MOUNTING BRACKET (for 4WD) 
    1. Install the transverse engine mounting bracket with the 3 bolts.

      Torque: 64 N*m (650 kgf*cm, 47 ft.*lbf) 

      Fig 10: Removing Bolts And Engine Mounting Bracket RR
      G05136525Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  13. INSTALL TRANSVERSE ENGINE MOUNTING BRACKET (for 2WD) 
    1. Install the transverse engine mounting bracket with the 3 bolts.

      Torque: 64 N*m (650 kgf*cm, 47 ft.*lbf) 

      Fig 11: Removing Drive Shaft Bearing Bracket (For 2WD)
      G05136524Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  14. INSTALL TRANSVERSE ENGINE MOUNTING BRACKET 
    1. Install the transverse engine mounting bracket with the 3 bolts.

      Torque: 54 N*m (551 kgf*cm, 40 ft.*lbf) 

      Fig 12: Locating Engine Mounting Bracket RH With Bolts
      G04974486Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  15. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH 
    1. Install a new gasket as shown in the illustration.
      Fig 13: Locating Exhaust Manifold Sub-Assembly RH With Nuts
      G04974511Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the exhaust manifold sub-assembly LH with the 6 nuts in the order shown in the illustration.

      Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf) 

      Fig 14: Installing Exhaust Manifold Sub-Assembly LH With Nuts
      G05136551Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  16. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR 
    1. Install the No. 2 exhaust manifold heat insulator with the 3 bolts.

      Torque: 8.5 N*m (87 kgf*cm, 75 in.*lbf) 

      Fig 15: Removing No. 2 Exhaust Manifold Heat Insulator
      G05136521Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  17. INSTALL NO. 2 MANIFOLD STAY 
    1. Install the No. 2 manifold stay with the bolt and nut in the order shown in the illustration.

      Torque: 34 N*m (347 kgf*cm, 25 ft.*lbf) 

      Fig 16: Installing No. 2 Manifold Stay With Bolt And Nut
      G05136553Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  18. INSTALL NO. 2 ENGINE OIL LEVEL DIPSTICK GUIDE 
    1. Install a new O-ring to the No. 2 engine oil level dipstick guide.
    2. Apply a light coat of engine oil to the O-rings.
    3. Push in the No. 2 engine oil level dipstick guide end into the No. 1 engine oil level dipstick guide.
      Fig 17: Locating No. 2 Engine Oil Level Dipstick Guide And O-Rings
      G06030662Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Install the No. 2 engine oil level dipstick guide with the bolt.

      Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf) 

    5. Install the engine oil level dipstick.
      Fig 18: Locating No. 2 Engine Oil Level Dipstick Guide And Bolt
      G06112728Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  19. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH 
    1. Install a new gasket as shown in the illustration.
      Fig 19: Locating Exhaust Manifold Sub-Assembly RH
      G04974516Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the exhaust manifold sub-assembly RH with the 6 nuts in the order shown in the illustration.

      Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf) 

  20. INSTALL INTAKE MANIFOLD 
    NOTE: DO NOT apply oil to the bolts listed below:
    TIGHTENING PART SPECIFICATION

    Tightening Parts
    Intake Manifold and Cylinder Head Sub-assembly RH
    Intake Manifold and Cylinder Head Sub-assembly LH
    Fig 20: Installing Exhaust Manifold Sub-Assembly RH With Nuts
    G05136556Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    1. Set a new gasket on each cylinder head.
      NOTE:
      • Align the port holes of the gasket and cylinder head.
      • Make sure that the gasket is installed in the correct direction.
    2. Set the intake manifold on the cylinder heads.
    3. Install and tighten the 6 bolts and 4 nuts uniformly in several steps.

      Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf) 

      Fig 21: Disconnecting A/F Sensor Connector Clamp
      G04974480Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  21. INSTALL NO. 2 ENGINE MOUNTING STAY RH 
    1. Install the No. 2 mounting stay RH with the bolt.

      Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf) 

  22. INSTALL IGNITION COIL ASSEMBLY  (See INSTALLATION )
  23. INSTALL ENGINE HANGERS 
    1. Install the 2 engine hangers with the 4 bolts as shown in the illustration.
      Fig 22: Removing Bolt And No. 2 Engine Mounting Stay RH
      G05136516Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Part No.: 

      No. 1 Engine hanger 12281-31120 

      No. 2 Engine hanger 12282-31100 

      Bolts 91671-10825 

      Torque: 33 N*m (337 kgf*cm, 24 ft.*lbf) 

    2. Attach the engine sling device and hang the engine with the chain block.
  24. REMOVE ENGINE STAND