Charging System (2AZ-FE) (Except Hybrid): Generator: Installation
- INSTALL GENERATOR ASSEMBLY
- Confirm that the wire harness of the crankshaft position sensor is secured to the wire harness clamp bracket through the back of the rib of the timing chain cover.
- Install the generator assembly with the 2 bolts.
Torque:
Bolt A 21 N*m (215 kgf*cm, 16 ft.*lbf)
Bolt B 52 N*m (530 kgf*cm, 38 ft.*lbf)
- Install the generator wire to terminal B with the nut.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- Install the clamp bracket with the bolt.
Torque: 8.4 N*m (86 kgf*cm, 74 in.*lbf)
- Attach the clamp and connect the generator connector to the generator.
- INSTALL V-RIBBED BELT (See INSTALLATION )
- INSTALL FRONT FENDER APRON SEAL RH
- INSTALL ENGINE UNDER COVER RH
- INSTALL FRONT WHEEL RH (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (See INSTALLATION )