Fender Panel Mudguard: Installation
HINT:
The procedure described below is for the LH side. Use the same procedure for both the RH and LH sides, unless otherwise specified.
- INSTALL QUARTER PANEL MUDGUARD
- Align the 2 pins of the quarter panel mudguard with the installation hole of the quarter outside molding.
- Install the quarter panel mudguard with the 4 screws.
Torque: 5.0 N*m (50 kgf*cm, 44 in.*lbf)
- Install the clip.
- INSTALL FRONT FENDER MUDGUARD
- Align the pin of the front fender mudguard with the installation hole of the front fender molding.
- Install the front fender mudguard with the 5 screws.
Torque: 5.0 N*m (50 kgf*cm, 44 in.*lbf)
- Install the clip.
- INSTALL REAR BUMPER COVER (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (w/ Back Sonar)
Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf)