Section 67 (Engine Control System (2GR-FE Except Hybrid) - System And Circuit Testing, On-Vehicle Inspection, Removal, Inspection And Installation): ECM: Installation
WARNING: This page is about a different variant/trim than selected.
- INSTALL ECM
- Install the ECM bracket with the 4 screws.
Torque: 3.0 N*m (31 kgf*cm, 27 in.*lbf)
- Connect the 2 ECM connectors.NOTE: When connecting the connector, make sure that dirt, water and other foreign matter do not become stuck between the connector and other parts.
- Connect the 2 ECM connectors and lower the 2 levers.NOTE: Make sure that the 2 levers are securely lowered.
- Connect the 2 ECM connectors and lower the 2 levers.
- Install the ECM with the 3 nuts.
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
- Install the ECM bracket with the 4 screws.
- INSTALL COWL TOP PANEL OUTER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL WINDSHIELD WIPER MOTOR AND LINK (See INSTALLATION )
- INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL FRONT FENDER TO COWL SIDE SEAL RH (See INSTALLATION )
- INSTALL FRONT FENDER TO COWL SIDE SEAL LH (See INSTALLATION )
- INSTALL WINDSHIELD WIPER ARM AND BLADE ASSEMBLY LH (See INSTALLATION )
- INSTALL WINDSHIELD WIPER ARM AND BLADE ASSEMBLY RH (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (See INSTALLATION )