Combination Meter ASSY: Installation
- Installation of the combination meter ASSY
- Connect the connector.
- Engage two clips and install the combination meter ASSY.
- Install the 2 screws.
- Installation of the instrument panel meter ornament UPR (Refer to INSTALLATION )
- Installation of the meter hood SUB-ASSY (Refer to INSTALLATION )
- Installation of instrument cluster finish panel SUB-ASSY CTR (Refer to INSTALLATION )
- Connection of the battery ground terminal
Standard value: T=6.0N.m {61kgf.cm} {4.4ft.lbf}
- Settings when removing/installing battery terminals (Refer to SETTING PROCEDURES AT PARTS REPLACEMENT AND REMOVAL/INSTALLATION )