Manual Transmission Assembly: Installation
- Install the rear cushion rubber to the transmission assembly.
Tightening torque:
35 N.m (3.6 kgf-m, 26 ft-lb)
- Install the transmission onto the engine.
- Lift-up the transmission gradually using a transmission jack.
- Loosen the turnbuckle of ST to return the engine to its original position.
- Engage at the spline section.
NOTE: Be careful not to hit the main shaft against the clutch housing cover. - Install the transmission rear crossmember.
Tightening torque:
T1: 75 N.m (7.6 kgf-m, 55 ft-lb)
T2: 140 N.m (14.3 kgf-m, 103 ft-lb)
- Take out the transmission jack.
- Tighten the nuts which hold the lower side of the transmission to the engine.
Tightening torque:
50 N.m (5.1 kgf-m, 36.9 ft-lb)
- Connect the transmission to the engine.
- Install the starter.
< Ref. to INSTALLATION , Starter. >
- Tighten the bolts which hold the upper side of the transmission to the engine.
Tightening torque:
50 N.m (5.1 kgf-m, 36.9 ft-lb)
- Install the starter.
- Remove the ST.
- Install the pitching stopper.
Tightening torque:
T1: 50 N.m (5.1 kgf-m, 37 ft-lb)
T2: 58 N.m (5.9 kgf-m, 43 ft-lb)
- Lift-up the vehicle.
- Install the front drive shaft into the transmission.
- Replace the differential side retainer oil seal. < Ref. to
REPLACEMENT , Differential Side Retainer Oil Seal. >
ST 18675AA000 DIFFERENTIAL SIDE OIL SEAL INSTALLER
NOTE: Be sure to replace the differential side retainer oil seal after the removing the front drive shaft. - Install the front drive shaft into the transmission.
ST 28399SA010 FRONT DRIVE SHAFT OIL SEAL PROTECTOR
- Install the ball joint of the lower arm.
Tightening torque:
49 N.m (5.0 kgf-m, 36 ft-lb)
- Attach the stabilizer link to the front arm.
Tightening torque:
45 N.m (4.6 kgf-m, 33.2 ft-lb)
- Attach the gear shift rod and stay.
- Attach the gear shift rod to the transmission.
- Attach the stay to the transmission.
- Install the propeller shaft. < Ref. to INSTALLATION , Propeller Shaft. >
- Install the heat shield cover. (If equipped)
- Install the rear exhaust pipe and muffler.
- Install the front exhaust pipe and the center exhaust pipe. (Non-turbo model)
< Ref. to INSTALLATION , Front Exhaust Pipe. >
- Install the center exhaust pipe. (Turbo model)< Ref. to INSTALLATION , Center Exhaust Pipe. >
- Install the operating cylinder.
Tightening torque:
37 N.m (3.8 kgf-m, 27.5 ft-lb)
- Connect the following connectors.
- Transmission ground cable
Tightening torque:
13 N.m (1.3 kgf-m, 9.4 ft-lb)
- Neutral position switch connector
- Back-up light switch connector
- Transmission ground cable
- Fill transmission gear oil through the transmission level gauge hole.
- Install the air intake chamber stay. (Non-turbo model)
Tightening torque:
16 N.m (1.6 kgf-m, 11.6 ft-lb)
- Install the air intake chamber and air cleaner case. (Non-turbo model) < Ref. to INSTALLATION , Air Cleaner Case. > < Ref. to INSTALLATION , Air Intake Chamber. >
- Install the intercooler. (Turbo model) < Ref. to INSTALLATION , Intercooler. >
- Connect the ground cable to battery.
- Take off the vehicle from lift arms.